Summary for Test 2019-04-02-19-1
Test performed: AASHTO T30-15Project Information
| Project Identifiers | Project ID: 213912 DEA: 033H71U4 EFIS: 0319000051 |
|---|---|
| DIST-CO-RTE-PM | 03-BUT-70-8.8/12.1 |
| Award Date | 05/09/2019 |
| Closeout Date | 09/23/2021 |
| Work Description | WIDEN RDWY, RDWY EX, HMA & MODIFY ELECT SYSTEM. |
| Location Description | BUTTE COUNTY NEAR OROVILLE FROM 0.1 MILE SOUTH OF PALERMO ROAD TO 0.6 MILE NORTH OF OPHIR ROAD |
| QA Service Level | 1 (Verified on 02/21/2019) |
Sample Information
| Sample Taken Date | 04/02/2019 | Sample Unique Key | 19 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 04/10/2019 | Sample type | Quality Control |
| A brief description of the sample | QC for Assembling JMF | The quantity of what the sample constitutes | 500 tons |
| From where was the sample collected | Source | First name of sampler or witnessed by | Jon |
| Last name of sampler or witnessed by | Blumer | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Teichert Materials Hallwood | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Teichert Materials Hallwood |
|---|---|---|---|
| Aggregate Size | Unknown | Aggregate Source | Unknown |
| RAP Stockpile | Stockpile Size (tons) | Unknown | |
| Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2019-04-02-19
DIME Test ID: 2019-04-02-19-1
Testing Lab: Teichert Materials - Sacramento
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2019-06-04
Test Results
Input Type: Calculated
Tester's full name: Eric Gifford
Date of test: 04/18/2019
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 97 %
Cumulative percent passing the 3/8 in. sieve: 85 %
Cumulative percent passing the 1/4 in. sieve: no data
Cumulative percent passing the #4 sieve: 51 %
Cumulative percent passing the #8 sieve: 34 %
Cumulative percent passing the #16 sieve: 25 %
Cumulative percent passing the #30 sieve: 19 %
Cumulative percent passing the #50 sieve: 14 %
Cumulative percent passing the #100 sieve: 11 %
Cumulative percent passing the #200 sieve: 8.3 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/4/2019 ✔
