Summary for Test 2019-04-29-19-1
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 213720 DEA: 024H2004 EFIS: 0218000094 |
|---|---|
| DIST-CO-RTE-PM | 02-SHA-89-26.3/29.2 |
| Award Date | 12/19/2018 |
| Closeout Date | 08/06/2019 |
| Work Description | PAVEMENT OVERLAY |
| Location Description | SHASTA COUNTY ABOUT 10 MILES NORTH OF BURNEY FROM 0.3 MILE NORTH OF CLARK CREEK ROAD TO LAKE BRITTON BRIDGE |
| QA Service Level | 1 (Verified on 01/04/2019) |
Sample Information
| Sample Taken Date | 04/29/2019 | Sample Unique Key | 19 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 04/29/2019 | Sample type | Verification |
| A brief description of the sample | 3/4-inch Type A HMA (eq. PG 64-16) | The quantity of what the sample constitutes | JMF Verification |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Cindy |
| Last name of sampler or witnessed by | Bryant | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | D77855 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Shaw Pit Facility | |
| Transportation Laboratory (TL) Number | 827789 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | 0 |
| Sublot number | 0 | HMA Mix Number | Not set |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2019-04-29-19
DIME Test ID: 2019-04-29-19-1
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2019-06-04
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Colt Sweeny
Date of test: 05/31/2019
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): no data
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 4.97 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/4/2019 ✔
