Summary for Test 2019-04-09-14-2
Test performed: AASHTO T30-15Project Information
| Project Identifiers | Project ID: 213720 DEA: 024H2004 EFIS: 0218000094 |
|---|---|
| DIST-CO-RTE-PM | 02-SHA-89-26.3/29.2 |
| Award Date | 12/19/2018 |
| Closeout Date | 08/06/2019 |
| Work Description | PAVEMENT OVERLAY |
| Location Description | SHASTA COUNTY ABOUT 10 MILES NORTH OF BURNEY FROM 0.3 MILE NORTH OF CLARK CREEK ROAD TO LAKE BRITTON BRIDGE |
| QA Service Level | 1 (Verified on 01/04/2019) |
Sample Information
| Sample Taken Date | 04/09/2019 | Sample Unique Key | 14 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 04/09/2019 | Sample type | Quality Control |
| A brief description of the sample | -3/8 inch RAP | The quantity of what the sample constitutes | Mix Design |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | CGI |
| Last name of sampler or witnessed by | CGI | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Shaw Pit Facility | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Shaw Pit Facility |
|---|---|---|---|
| Aggregate Size | Fine | Aggregate Source | Unknown |
| RAP Stockpile | Stockpile Size (tons) | Unknown | |
| Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2019-04-09-14
DIME Test ID: 2019-04-09-14-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2019-05-13
Test Results
Input Type: Calculated
Tester's full name: CGI
Date of test: 04/09/2019
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 98 %
Cumulative percent passing the 1/4 in. sieve: 84.5 %
Cumulative percent passing the #4 sieve: 71 %
Cumulative percent passing the #8 sieve: 48 %
Cumulative percent passing the #16 sieve: 32 %
Cumulative percent passing the #30 sieve: 22 %
Cumulative percent passing the #50 sieve: 15 %
Cumulative percent passing the #100 sieve: 11 %
Cumulative percent passing the #200 sieve: 8.2 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/13/2019 ✔
