Summary for Test 2019-04-01-21-2
Test performed: AASHTO T30-15Project Information
| Project Identifiers | Project ID: 212753 DEA: 020H7604 EFIS: 0215000086 |
|---|---|
| DIST-CO-RTE-PM | 02-LAS,PLU-VAR-VAR |
| Award Date | 03/28/2019 |
| Closeout Date | 09/02/2020 |
| Work Description | FULL DEPTH RECLAMATION AND DRAINAGE REHABILITATION |
| Location Description | LASSEN AND PLUMAS COUNTIES AT AND NEAR CHILCOOT FROM 0.9 MILE WEST OF SUMMIT SCHOOL DRIVE TO 0.7 MILE EAST OF ROUTE 395 |
| QA Service Level | 1 (Verified on 01/08/2019) |
Sample Information
| Sample Taken Date | 04/01/2019 | Sample Unique Key | 21 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 04/01/2019 | Sample type | Quality Control |
| A brief description of the sample | 3/8-inch Minus RAP (Ignition) | The quantity of what the sample constitutes | production stockpile. |
| From where was the sample collected | Source | First name of sampler or witnessed by | Ted |
| Last name of sampler or witnessed by | Kinsey | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Hat Creek - Ward Lake | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Ward Lake Pit |
|---|---|---|---|
| Aggregate Size | Unknown | Aggregate Source | Unknown |
| RAP Stockpile | Stockpile Size (tons) | Unknown | |
| Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2019-04-01-21
DIME Test ID: 2019-04-01-21-2
Testing Lab: CGI Technical Services, Incorporated
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2019-05-08
Test Results
Input Type: Calculated
Tester's full name: Ted Kinsey
Date of test: 04/12/2019
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 100 %
Cumulative percent passing the 1/4 in. sieve: no data
Cumulative percent passing the #4 sieve: 74 %
Cumulative percent passing the #8 sieve: 52 %
Cumulative percent passing the #16 sieve: 38 %
Cumulative percent passing the #30 sieve: 29 %
Cumulative percent passing the #50 sieve: 22 %
Cumulative percent passing the #100 sieve: 16 %
Cumulative percent passing the #200 sieve: 11 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/8/2019 ✔