Summary for Test 2017-04-03-18-1

Test performed: AASHTO T30-15

Project Information

Project IdentifiersProject ID: 213793
DEA: 060W7004
EFIS: 0617000283
DIST-CO-RTE-PM06-FRE-33-24.3/R29.0,R39.9/44.5
Award Date01/24/2019
Closeout Date08/20/2021
Work DescriptionCOLD PLANE AC PAVEMENT, PLACE HMA RESURFACING.
Location DescriptionFRESNO COUNTY ABOUT 7.8 MILES NORTH OF COALINGA FROM NORTH JUNCTION ROUTE 198 TO SOUTH JUNCTION ROUTE 33/5 AND FROM 0.1 MILE NORTH OF NORTH JUNCTION ROUTE 33/5 TO EL PROGRESSIO ROAD
QA Service Level1 (Verified on 01/09/2019)

Sample Information

Sample Taken Date04/03/2017 Sample Unique Key18
Date that the sample was received by the laboratory/organization performing the testing04/03/2017 Sample typeQuality Control
A brief description of the sampleCombined RAP (Dispute Resolution) The quantity of what the sample constitutesJMF HMA Design Data (Dispute Resolution)
From where was the sample collectedSource First name of sampler or witnessed bySPM
Last name of sampler or witnessed byAvenal Title of samplerNA
Telephone number of sampler805-473-3016 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameSPM-Avenal
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifierNot set Structure nameNot set
Bid ItemNot set

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceSPM Avenal
Aggregate SizeUnknown Aggregate SourceUnknown
RAP StockpileStatic Stockpile Size (tons)Unknown
Reclaimed Asphalt Pavement Mix NumberNot set

Test Details

DIME Sample ID: 2017-04-03-18
DIME Test ID: 2017-04-03-18-1
Testing Lab: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2019-05-08

Test Results


Input Type: Calculated
Tester's full name: G3 Quality, Inc.
Date of test: 04/03/2017
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 99 %
Cumulative percent passing the 3/8 in. sieve: 93 %
Cumulative percent passing the 1/4 in. sieve: 93 %
Cumulative percent passing the #4 sieve: 54 %
Cumulative percent passing the #8 sieve: 33 %
Cumulative percent passing the #16 sieve: 25 %
Cumulative percent passing the #30 sieve: 20 %
Cumulative percent passing the #50 sieve: 15 %
Cumulative percent passing the #100 sieve: 11 %
Cumulative percent passing the #200 sieve: 7.3 %
General comments (publicly viewable) (Max 1000 characters): JMF Renewal Dispute Resolution - HQ is handling the dispute by performing a full JMF verifcation through the Aggregate and HMA Labs. JMF served Project ID: 0617000283.

Test was verified on 5/1/2019 ✔