Summary for Test 2019-04-17-18-9
Test performed: CTM 217-June 2011Project Information
Project Identifiers | Project ID: 210837 DEA: 080J0804 EFIS: 0800000283 COOP: 081625 |
---|---|
DIST-CO-RTE-PM | 08-RIV-15-34.7/51.6 |
Award Date | 04/17/2017 |
Closeout Date | Not set |
Work Description | (Alternative Delivery) DESIGN-BUILD OF THE INTERSTATE 15 EXPRESS LANES PROJECT |
Location Description | Riverside County and SBD-15-0.0/1.3 |
QA Service Level | 1 (Verified on 05/08/2017) |
Sample Information
Sample Taken Date | 04/17/2019 | Sample Unique Key | 18 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/17/2019 |
Sample type | Per Request | A brief description of the sample | Agg Subbase Recycled Asphalt |
The quantity of what the sample constitutes | 1 bag | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Ari | Last name of sampler or witnessed by | Khasraw |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Caltrans | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Not set | |
Structure name | Not set |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | Unknown |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | Unknown | The fabricator/manufacturer designation for the sample | Unknown |
The plant number | Unknown | A detailed description of where the material sample was collected | I-15 NB |
Where the material sample would have been placed if not sampled | Unknown | Primary Aggregate Nominal Size | 3/4 inch |
The concrete mix design number | Unknown | Lot number | Unknown |
Sublot number | Unknown | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2019-04-17-18
DIME Test ID: 2019-04-17-18-9
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2019-05-07
Test Results
Number of tests: 2
Input Type: Calculated
Tester's full name: Husni Ankir
Date of test: 04/20/2019
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 6
Sand reading (test 1): 3.7
Clay reading (test 2): 5.6
Sand reading (test 2): 3.5
Sand equivalent (test 1): 62
Sand equivalent (test 2): 63
Sand equivalent before temperature correction: 63
Sand equivalent after temperature correction: 63
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/30/2019 ✔