Summary for Test 2019-04-24-20-1

Test performed: AASHTO T30-15

Project Information

Project IdentifiersProject ID: 66667
DEA: JMFPP
EFIS: 0019000043
DIST-CO-RTE-PM59---
Award DateNot set
Closeout DateNot set
Work DescriptionSpecial project for submitting Sample information for JMF Prequalification Program.
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date04/24/2019 Sample Unique Key20
Date that the sample was received by the laboratory/organization performing the testing04/24/2019 Sample typeQuality Control
A brief description of the sampleCombined RAP The quantity of what the sample constitutes24 boxes
From where was the sample collectedSource First name of sampler or witnessed byEscobar
Last name of sampler or witnessed byEscobar Title of samplerQC Operations Supervisor
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameGranite Construction Company
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifierNot set Structure nameNot set
Bid ItemNot set

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceGranite Construction
Aggregate SizeUnknown Aggregate SourceUnknown
RAP Stockpile Stockpile Size (tons)Unknown
Reclaimed Asphalt Pavement Mix NumberNot set

Test Details

DIME Sample ID: 2019-04-24-20
DIME Test ID: 2019-04-24-20-1
Testing Lab: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2019-05-06

Test Results


Input Type: Calculated
Tester's full name: GARCO Testing Laboratories
Date of test: 02/11/2019
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 100 %
Cumulative percent passing the 1/4 in. sieve: 100 %
Cumulative percent passing the #4 sieve: 75 %
Cumulative percent passing the #8 sieve: 48 %
Cumulative percent passing the #16 sieve: 33 %
Cumulative percent passing the #30 sieve: 24 %
Cumulative percent passing the #50 sieve: 17 %
Cumulative percent passing the #100 sieve: 11 %
Cumulative percent passing the #200 sieve: 8 %
General comments (publicly viewable) (Max 1000 characters): AASHTO T 30 RAP Gradation Sample 1

Test was verified on 4/29/2019