Summary for Test 2019-04-16-21-1

Test performed: AASHTO T308-10

Project Information

Project IdentifiersProject ID: 209695
DEA: 08347704
EFIS: 0800000616
DIST-CO-RTE-PM08-SBD-SR-58-0/12.9
Award Date11/10/2017
Closeout Date01/14/2021
Work Description(Alternative Delivery) The CMGC project will upgrade SR 58 from 2- to 4-lanes in San Bernardino County from the Kern County line to 7.5 miles east of US-395.
Location DescriptionSR-58 / 395 Kramer Junction project. In San Bernardino County from the Kern County line to 7.5 miles east of US-395.
QA Service Level1 (Verified on 12/01/2017)

Sample Information

Sample Taken Date04/16/2019 Sample Unique Key21
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/17/2019
Sample typeDepartment Acceptance A brief description of the sample1/2" HMA-A R15 PG 64-28M (1.0% Lime Slurry)
The quantity of what the sample constitutes102.06 tons out From where was the sample collectedSource
First name of sampler or witnessed byQC Last name of sampler or witnessed byQC
Title of sampler Telephone number of sampler
Laboratory sample identification0235A-19 Linked DIME Sample ID
The fabricator/manufacturer/facility nameVulcan-Oro Grande Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading1/2 inch Lot numberUnknown
Sublot numberUnknown HMA Mix NumberNot set

Test Details

DIME Sample ID: 2019-04-16-21
DIME Test ID: 2019-04-16-21-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2019-04-29

Test Results


What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Angelito Villegas
Date of test: 04/18/2019
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): no data
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 4.39 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 4/22/2019