Summary for Test 2019-01-04-64-1

Test performed: AASHTO T30-15

Project Information

Project IdentifiersProject ID: 66667
DEA: JMFPP
EFIS: 0019000043
DIST-CO-RTE-PM59---
Award DateNot set
Closeout DateNot set
Work DescriptionSpecial project for submitting Sample information for JMF Prequalification Program.
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date01/04/2019 Sample Unique Key64
Date that the sample was received by the laboratory/organization performing the testing01/04/2019 Sample typeQuality Control
A brief description of the sample3/4 HMA Type A The quantity of what the sample constitutesJMF
From where was the sample collectedSource First name of sampler or witnessed byCarlos
Last name of sampler or witnessed byManzo Title of samplerQC Technician
Telephone number of sampler805-440-7390 Laboratory sample identificationTEM34SPLA
Linked DIME Sample ID The fabricator/manufacturer/facility nameSPM-Avenal
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifierNot set Structure nameNot set
Bid ItemNot set

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceStockpile
Aggregate Size Aggregate Source
RAP Stockpile Stockpile Size (tons)
Reclaimed Asphalt Pavement Mix NumberNot set

Test Details

DIME Sample ID: 2019-01-04-64
DIME Test ID: 2019-01-04-64-1
Testing Lab: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2019-04-19

Test Results


Input Type: Calculated
Tester's full name: Gurpartap Grewal
Date of test: 01/04/2019
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 97 %
Cumulative percent passing the 3/8 in. sieve: 87 %
Cumulative percent passing the 1/4 in. sieve: 87 %
Cumulative percent passing the #4 sieve: 60 %
Cumulative percent passing the #8 sieve: 43 %
Cumulative percent passing the #16 sieve: 32 %
Cumulative percent passing the #30 sieve: 25 %
Cumulative percent passing the #50 sieve: 18 %
Cumulative percent passing the #100 sieve: 13 %
Cumulative percent passing the #200 sieve: 8.5 %
General comments (publicly viewable) (Max 1000 characters): RAP Sample 1 T-30

Test was verified on 4/12/2019