Summary for Test 2019-03-27-15-3
Test performed: ASTM D36-14ε1Project Information
| Project Identifiers | Project ID: 66667 DEA: JMFPP EFIS: 0019000043 |
|---|---|
| DIST-CO-RTE-PM | 59--- |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Special project for submitting Sample information for JMF Prequalification Program. |
| Location Description | Not set |
| QA Service Level | NOT VERIFIED |
Sample Information
| Sample Taken Date | 03/27/2019 | Sample Unique Key | 15 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 03/27/2019 | Sample type | Quality Control |
| A brief description of the sample | Asphalt Rubber Binder | The quantity of what the sample constitutes | 1 sample set |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | David |
| Last name of sampler or witnessed by | Ruedi | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Valero | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Not set | Structure name | Not set |
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Rubber Binder | Asphalt modifier supplier | Valero |
|---|---|---|---|
| Performance Grade | Not set | Lot number | Not set |
| Sublot number | Not set | Asphalt Rubber Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2019-03-27-15
DIME Test ID: 2019-03-27-15-3
Testing Lab: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Test Method: ASTM D36-14ε1: Standard Test Method for Softening Point of Bitumen (Ring-and-Ball Apparatus) (Softening Point)
Test Release Date: 2019-04-11
Test Results
ASTM Thermometer used?: C
Input Type: Calculated
Tester's full name: Mike Paulson
Date of test: 04/01/2019
Softening Point Sample 1: 155 C
Softening Point Sample 2: no data
Bath Liquid: freshly boiled distilled water
Minutes Reaction: no data
General comments (publicly viewable) (Max 1000 characters): JMFPP: D36
Asphalt Rubber Binder Design and Profile (unworked)
Test was verified on 4/4/2019 ✔
