Summary for Test 2019-03-27-15-2

Test performed: ASTM D5329-16

Project Information

Project IdentifiersProject ID: 66667
DEA: JMFPP
EFIS: 0019000043
DIST-CO-RTE-PM59---
Award DateNot set
Closeout DateNot set
Work DescriptionSpecial project for submitting Sample information for JMF Prequalification Program.
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date03/27/2019 Sample Unique Key15
Date that the sample was received by the laboratory/organization performing the testing03/27/2019 Sample typeQuality Control
A brief description of the sampleAsphalt Rubber Binder The quantity of what the sample constitutes1 sample set
From where was the sample collectedManufacturer First name of sampler or witnessed byDavid
Last name of sampler or witnessed byRuedi Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameValero
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifierNot set Structure nameNot set
Bid ItemNot set

Material Information

Material TypeAsphalt Rubber Binder Asphalt modifier supplierValero
Performance GradeNot set Lot numberNot set
Sublot numberNot set Asphalt Rubber Binder Mix NumberNot set

Test Details

DIME Sample ID: 2019-03-27-15
DIME Test ID: 2019-03-27-15-2
Testing Lab: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Test Method: ASTM D5329-16: Standard Test Methods for Sealants and Fillers, Hot-Applied, for Joints and Cracks in Asphalt Pavements and Portland Cement Concrete Pavements (Asphalt Pavement)
Test Release Date: 2019-04-11

Test Results


Input Type: Calculated
Tester's full name: Mike Paulson
Date of test: 04/01/2019
Temperature: no data
Ball Penetration (P1): no data
Final Dial reading (F1): no data
Ball Penetration (P2): no data
Final Dial reading (F2): no data
Ball Penetration (P3): no data
Final Dial reading (F3): no data
Resilience 1: no data
Resilience 2: no data
Resilience 3: no data
Average Resilience: 51 %
Minutes Reaction: no data
General comments (publicly viewable) (Max 1000 characters): JMFPP: D5329 Asphalt Rubber Binder Design and Profile (unworked)

Test was verified on 4/4/2019 ✔