Summary for Test 2019-03-26-10-2
Test performed: CTM 524-March 2013Project Information
Project Identifiers | Project ID: 213551 DEA: 080K2934 EFIS: 0812000100 |
---|---|
DIST-CO-RTE-PM | 08-SBD-10-R36.8/R39.2 |
Award Date | 11/09/2018 |
Closeout Date | 09/15/2021 |
Work Description | PAVEMENT REHABILITATION AND CONTINUOUSLY REINFORCED CONCRETE PAVEMENT |
Location Description | SAN BERNARDINO COUNTY IN YUCAIPA FROM 0.2 MILE WEST OF LIVE OAK CANYON ROAD TO COUNTY LINE ROAD UNDERCROSSING |
QA Service Level | 1 (Verified on 12/31/2018) |
Sample Information
Sample Taken Date | 03/26/2019 | Sample Unique Key | 10 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/27/2019 |
Sample type | Department Acceptance | A brief description of the sample | concrete beams |
The quantity of what the sample constitutes | 3 beams | From where was the sample collected | Job Site |
First name of sampler or witnessed by | S | Last name of sampler or witnessed by | Black |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 1RA, 1RB, 1RC | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | GL THROOP | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Unknown | |
Structure name | Unknown |
Material Information
Material Type | Concrete | The concrete mix design number | 2010-007 |
---|---|---|---|
The truck number from where the sample was collected | Unknown | The batch plant ticket number from where the sample was collected | tt1 |
Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | Unknown |
A detailed description of where the material sample was collected | on jobsite at concrete truck | Where the material sample would have been placed if not sampled | Unknown |
From Lot No. | Unknown | Bag Lot No. | Unknown |
Test Details
DIME Sample ID: 2019-03-26-10
DIME Test ID: 2019-03-26-10-2
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength Concrete
Test Release Date: 2019-04-05
Test Results
Number of specimens: 1
Does the testing machine measure load or stress on the beam specimen?: Load
Fracture initiates in the tension surface: Within the Middle Third of the Span Length
Fracture occurred at a capped section: No
Is a beam dimensional correction factor used?: No
Input Type: Calculated
Tester's full name: kaushal talati
Date of test: 03/29/2019
Identification number: 1RB
Width of specimen: 6 inch
Depth of specimen: 6.125 inch
Span length of specimen: 18 inch
Maximum load applied: 8450 lb
Curing history and apparent moisture condition of the specimen: Sand Pit
If specimen was capped, ground or if leather shims were used: No
Defects in specimen, including numbers of beams discarded during test: No
Age of specimen: 3 days
Age of specimen in hours: no data
Modulus of rupture: 710 psi
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/5/2019 ✔