Summary for Test 2018-07-16-6-1
Test performed: AASHTO T269-14Project Information
Project Identifiers | Project ID: 210794 DEA: 062HT104 EFIS: 0612000287 |
---|---|
DIST-CO-RTE-PM | 06-FRE-99-23.5/26.7 |
Award Date | 06/30/2016 |
Closeout Date | 09/16/2020 |
Work Description | (Alternative Delivery) Realign Freeway CONTACT SMR PRIOR TO PERFORMING ANY TESTING OR INSPECTION. CMGC PROJECT. Realign Route 99 between Ashlan Avenue and Olive Avenue to accommodate the High Speed Train (HST). |
Location Description | State Highway 99 in Fresno (Fresno County) from 0.2 miles North of Olive Ave over-crossing to 0.2 miles North of Ashlan Ave over-crossing. |
QA Service Level | 1 (Verified on 10/01/2015) |
Sample Information
Sample Taken Date | 07/16/2018 | Sample Unique Key | 6 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/19/2019 |
Sample type | Dispute Resolution | A brief description of the sample | RHMA-G 3/4" PG64-16RB |
The quantity of what the sample constitutes | 4 boxes | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Unknown | Last name of sampler or witnessed by | unknown |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 186G-19 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Vulcan-Ashlan | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Not set | |
Structure name | Not set |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | RHMA-G |
---|---|---|---|
HMA Grading | 3/4 inch | Lot number | 6 |
Sublot number | 10 | HMA Mix Number | Not set |
Test Details
DIME Sample ID: 2018-07-16-6
DIME Test ID: 2018-07-16-6-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T269-14: Standard Method of Test for Percent Air Voids in Compacted Dense and Open Asphalt Mixtures (Air Void)
Test Release Date: 2019-04-03
Test Results
Number of tests: 3
Is the sample lab compacted or field compacted?:
Input Type: Calculated
Tester's full name: Angelito Villegas
Date of test: 03/22/2019
Percent Air Voids: 1.7 %
Percent Air Voids 2: 1.6 %
Percent Air Voids 3: 1.7 %
Average Percent Air Voids: 1.7 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/3/2019 ✔