Summary for Test 2019-02-27-6-3
Test performed: AASHTO T315-12Project Information
| Project Identifiers | Project ID: 211650 DEA: 07293504 EFIS: 0713000215 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-138-58.8/60.2 |
| Award Date | 02/22/2017 |
| Closeout Date | 03/26/2021 |
| Work Description | WIDEN ROUTE 138 AND CONSTRUCT DRAINAGE FACILITIES. |
| Location Description | LOS ANGELES COUNTY AT PEARBLOSSOM 0.3 MILE WEST OF 121ST STREET TO LONGVIEW ROAD |
| QA Service Level | 1 (Verified on 09/12/2016) |
Sample Information
| Sample Taken Date | 02/27/2019 | Sample Unique Key | 6 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/28/2019 |
| Sample type | Department Acceptance | A brief description of the sample | Asphalt Binder |
| The quantity of what the sample constitutes | 750 | From where was the sample collected | Source |
| First name of sampler or witnessed by | Kevin | Last name of sampler or witnessed by | Hopkins |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Vulcan | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Not set | |
| Structure name | Not set | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG64-16/10 |
|---|---|---|---|
| Modified | No | Lot number | Not set |
| Sublot number | Not set | Tank number | Not set |
| Time of sample | Not set | HMA Supplier | Not set |
| Certified Asphalt Supplier | Not set | Multigrade | Not set |
| Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2019-02-27-6
DIME Test ID: 2019-02-27-6-3
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T315-12: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Test Release Date: 2019-10-15
Test Results
Input Type: Calculated
Tester's full name: Majid Essa
Date of test: 03/06/2019
Phase: RTFO residue
Phase Angle (δ) (for the 10 cycles): 87.1 degree
Dynamic Shear, G*/sin(δ): 3.99 kPa
(G*) x sin(δ)=: no data
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/15/2019 ✔
