Summary for Test 2019-03-14-3-6
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 211235 DEA: 054482U4 EFIS: 0500000543 |
|---|---|
| DIST-CO-RTE-PM | 05-SB-101-2.2/3.3 |
| Award Date | 06/20/2016 |
| Closeout Date | 08/23/2021 |
| Work Description | BUILD AND RECONSTRUCT BRIDGES, CONSTRUCT RAMPS AND FRONTAGE ROAD. |
| Location Description | SANTA BARBARA COUNTY IN CARPINTERIA FROM 0.2 MILE SOUTH OF CARPINTERIA CREEK BRIDGE TO FRANKLIN CREEK BRIDGE |
| QA Service Level | 1 (Verified on 07/27/2016) |
Sample Information
| Sample Taken Date | 03/14/2019 | Sample Unique Key | 3 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 03/20/2019 | Sample type | Quality Assurance |
| A brief description of the sample | Zap couplers | The quantity of what the sample constitutes | 150 |
| From where was the sample collected | Fabricator | First name of sampler or witnessed by | Ed |
| Last name of sampler or witnessed by | Fleming | Title of sampler | TET |
| Telephone number of sampler | 707-310-2029 | Laboratory sample identification | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Bar Splice | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | B10-112-19 | |
| Structure unique identifier | Not set | Structure name | Not set |
| Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Service | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Manufacturer | Nucor |
| Coupler Manufacturer | Zap | Intermediate Assembler or Fabricator | Harris Rebar |
| Rebar Size | 8 | Coupler Model | Zap |
| Coating Standards | Uncoated | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Unknown | Rebar Hoop Fabricator | Unknown |
| Coupler Component Heat/Lot Number(s) | MM18106565, MM18103576 | Rebar Heat Number(s) | 3500005186, 3500004803 |
| Rebar Size 2 | 10 | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2019-03-14-3
DIME Test ID: 2019-03-14-3-6
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Test Release Date: 2019-03-29
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: Fred
Date of test: 03/22/2019
UTM: 400KIP
Halo ID: Larger
Temperature: 72 F
| Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|---|
| 1 | 3 | C24 | #10/32mm | 1.27 | 0 | 122640 | 96565 | Service Splice | Fred |
General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
Source: Partner Data Point FileTest graph for the Sample
Test was verified on 3/22/2019 ✔
