Summary for Test 2019-03-15-7-1
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 212645 DEA: 080N9714 EFIS: 0815000101 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-395-39.0/45.9 |
| Award Date | 11/07/2017 |
| Closeout Date | 12/12/2019 |
| Work Description | WIDEN EXISTING SHOULDERS TO 8' AND CONSTRUCT 4' MEDIAN BUFFER |
| Location Description | SAN BERNARDINO COUNTY NEAR ADELANTO FROM 2.2 MILES NORTH OF KRAMER ROAD TO ROUTE 58 |
| QA Service Level | 1 (Verified on 04/04/2018) |
Sample Information
| Sample Taken Date | 03/15/2019 | Sample Unique Key | 7 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 03/15/2019 | Sample type | Department Acceptance |
| A brief description of the sample | 1" HMA-A | The quantity of what the sample constitutes | 147.56 tons out |
| From where was the sample collected | Source | First name of sampler or witnessed by | unknown |
| Last name of sampler or witnessed by | unknown | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Blue Diamond Victorville | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Not set | Structure name | Not set |
| Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 1 inch | Lot number | Unknown |
| Sublot number | Unknown | HMA Mix Number | Not set |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2019-03-15-7
DIME Test ID: 2019-03-15-7-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2019-03-26
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Anthony Diaz
Date of test: 03/19/2019
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): no data
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 4.10 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 3/19/2019 ✔
