Summary for Test 2018-10-29-13-2
Test performed: CTM 521-November 2014Project Information
Project Identifiers | Project ID: 211260 DEA: 072159U4 EFIS: 0715000160 |
---|---|
DIST-CO-RTE-PM | 07-LA,ORA-5-0.0/1.5, 44.3/44.4 |
Award Date | 05/27/2016 |
Closeout Date | 08/01/2023 |
Work Description | CONSTRUCT HOV LANES AND MIX FLOW LANES. |
Location Description | LOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK |
QA Service Level | 1 (Verified on 03/16/2016) |
Sample Information
Sample Taken Date | 10/29/2018 | Sample Unique Key | 13 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/30/2018 |
Sample type | Quality Control | A brief description of the sample | 6x12 Cylinders |
The quantity of what the sample constitutes | 6 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Bobby | Last name of sampler or witnessed by | Togores |
Title of sampler | QC Field Technician | Telephone number of sampler | Unknown |
Laboratory sample identification | Set 1 | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | Jobsite | Transportation Laboratory (TL) Number | Unknown |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | Unknown |
Structure name | Unknown |
Material Information
Material Type | Concrete | The concrete mix design number | G3-15-3600-590 |
---|---|---|---|
The truck number from where the sample was collected | Load 5 | The batch plant ticket number from where the sample was collected | 0 |
Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | Set 1 |
A detailed description of where the material sample was collected | RW NF66 Truck 1154 | Where the material sample would have been placed if not sampled | Unknown |
From Lot No. | Unknown | Bag Lot No. | Unknown |
Test Details
DIME Sample ID: 2018-10-29-13
DIME Test ID: 2018-10-29-13-2
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete Cylinders
Test Release Date: 2019-02-21
Test Results
Unit system used?: US Units
Number of specimens: 2
Test performed: With no density determined
Input Type: Calculated
Tester's full name: Ron Hernandez
Date of test: 11/26/2018
Average diameter of cylinder 1: 6.01 in
Average diameter of cylinder 2: 6.01 in
Maximum load on cylinder 1: 138530 lb
Maximum load on cylinder 2: 140000 lb
Type of fracture pattern of cylinder 1: 5
Type of fracture pattern of cylinder 2: 5
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1
Age of specimen: 28 days
Cross sectional area of cylinder 1: 28.37 in^2
Cross sectional area of cylinder 2: 28.37 in^2
Compressive strength (to nearest 10 psi): 4910 psi
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 2/21/2019 ✔