Summary for Test 2019-01-04-10-4
Test performed: CTM 202-Oct 2014Project Information
| Project Identifiers | Project ID: 66667 DEA: JMFPP EFIS: 0019000043 |
|---|---|
| DIST-CO-RTE-PM | 59--- |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Special project for submitting Sample information for JMF Prequalification Program. |
| Location Description | Not set |
| QA Service Level | NOT VERIFIED |
Sample Information
| Sample Taken Date | 01/04/2019 | Sample Unique Key | 10 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 01/04/2019 |
| Sample type | Quality Control | A brief description of the sample | RAP |
| The quantity of what the sample constitutes | JMF | From where was the sample collected | Source |
| First name of sampler or witnessed by | Carlos | Last name of sampler or witnessed by | Manzo |
| Title of sampler | QC Technician | Telephone number of sampler | 805-440-7390 |
| Laboratory sample identification | TEM34SPLA | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | SPM-Templeton | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Not set | |
| Structure name | Not set | Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Stockpile |
|---|---|---|---|
| Aggregate Size | 1/2 | Aggregate Source | |
| RAP Stockpile | Stockpile Size (tons) | ||
| Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2019-01-04-10
DIME Test ID: 2019-01-04-10-4
Testing Lab: Sierra Pacific Materials
Test Method: CTM 202-Oct 2014: Method of Test for Determining Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2019-02-12
Test Results
What size aggregate is being tested?: Combined Gradation
Input Type: Calculated
Tester's full name: unknown
Date of test: 01/04/2019
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 97 %
Cumulative percent passing the 3/8 in. sieve: 89 %
Cumulative percent passing the #4 sieve: 69 %
Cumulative percent passing the #8 sieve: 55 %
Cumulative percent passing the #16 sieve: 42 %
Cumulative percent passing the #30 sieve: 28 %
Cumulative percent passing the #50 sieve: 16 %
Cumulative percent passing the #100 sieve: 9 %
Cumulative percent passing the #200 sieve: 9 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 2/12/2019 ✔
