Summary for Test 2019-01-21-8-2

Test performed: AASHTO T30-15

Project Information

Project IdentifiersProject ID: 213469
DEA: 024C40V4
EFIS: 0218000125
DIST-CO-RTE-PM02-SHA-5-R3.8/R11.7
Award Date11/06/2018
Closeout Date08/16/2023
Work DescriptionWIDEN TO 6 LANES, BRIDGE REPLACEMENT AND WIDENING AND ROADWAY REHAB
Location DescriptionSHASTA COUNTY IN AND NEAR ANDERSON FROM ROUTE 5/273 SEPARATION TO 0.4 MILE SOUTH OF CHURN CREEK ROAD OVERCROSSING
QA Service Level1 (Verified on 12/31/2018)

Sample Information

Sample Taken Date01/21/2019 Sample Unique Key8
Date that the sample was received by the laboratory/organization performing the testing01/21/2019 Sample typeQuality Control
A brief description of the sampleCombined RAP The quantity of what the sample constitutesMix Design
From where was the sample collectedSource First name of sampler or witnessed byCGI
Last name of sampler or witnessed byCGI Title of sampler
Telephone number of sampler Laboratory sample identification19-1001 314
Linked DIME Sample ID The fabricator/manufacturer/facility nameFawndale Rock and Asphalt
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifierNot set Structure nameNot set
Bid ItemNot set

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceFawndale Rock and Asphalt, Redding, CA
Aggregate Size-3/8-inch Aggregate SourceUnknown
RAP Stockpile Stockpile Size (tons)1000
Reclaimed Asphalt Pavement Mix NumberNot set

Test Details

DIME Sample ID: 2019-01-21-8
DIME Test ID: 2019-01-21-8-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2019-02-06

Test Results


Input Type: Calculated
Tester's full name: CGI
Date of test: 01/21/2019
Cumulative percent passing the 2 in. sieve: no data
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 94 %
Cumulative percent passing the 1/4 in. sieve: 81.5 %
Cumulative percent passing the #4 sieve: 69 %
Cumulative percent passing the #8 sieve: 49 %
Cumulative percent passing the #16 sieve: 34 %
Cumulative percent passing the #30 sieve: 23 %
Cumulative percent passing the #50 sieve: 15 %
Cumulative percent passing the #100 sieve: 10 %
Cumulative percent passing the #200 sieve: 7.4 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 2/6/2019 ✔