Summary for Test 2018-06-04-35-3
Test performed: AASHTO T30-15Project Information
| Project Identifiers | Project ID: 212741 DEA: 020E1804 EFIS: 0200000022 |
|---|---|
| DIST-CO-RTE-PM | 02-PLU-89-29.8/30.2 |
| Award Date | 12/13/2017 |
| Closeout Date | 12/17/2021 |
| Work Description | BRIDGE REPLACEMENT |
| Location Description | PLUMAS COUNTY NEAR CANYON DAM FROM 0.2 MILE SOUTH TO 0.3 MILE NORTH OF LAKE ALMANOR SPILLWAY |
| QA Service Level | 1 (Verified on 12/06/2017) |
Sample Information
| Sample Taken Date | 06/04/2018 | Sample Unique Key | 35 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 06/05/2018 | Sample type | Verification |
| A brief description of the sample | RAP | The quantity of what the sample constitutes | JMF Verification |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Derrick |
| Last name of sampler or witnessed by | Curry | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | D77438 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Sierra Cascade Aggregate and Asphalt Products | |
| Transportation Laboratory (TL) Number | 894777 | Inspector Lot Number from the Transportation Laboratory (TL) Form | JMF 18-04-S3 |
| Structure unique identifier | Not set | Structure name | Not set |
| Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Dig It Construction |
|---|---|---|---|
| Aggregate Size | 3/8-inch | Aggregate Source | Unknown |
| RAP Stockpile | Stockpile Size (tons) | Unknown | |
| Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2018-06-04-35
DIME Test ID: 2018-06-04-35-3
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2019-01-22
Test Results
Input Type: Calculated
Tester's full name: NRML-R
Date of test: 06/08/2018
Cumulative percent passing the 2 in. sieve: no data
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 99.5 %
Cumulative percent passing the 3/8 in. sieve: 93.9 %
Cumulative percent passing the 1/4 in. sieve: 82.5 %
Cumulative percent passing the #4 sieve: 75 %
Cumulative percent passing the #8 sieve: 56.9 %
Cumulative percent passing the #16 sieve: 42.6 %
Cumulative percent passing the #30 sieve: 31.8 %
Cumulative percent passing the #50 sieve: 22.4 %
Cumulative percent passing the #100 sieve: 15.7 %
Cumulative percent passing the #200 sieve: 11.51 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 1/22/2019 ✔