Summary for Test 2014-05-23-13000954-3

Test performed: ASTM C138-10b

Project Information

Project IdentifiersProject ID: 209175
DEA: 030F2204
EFIS: 0300000072
DIST-CO-RTE-PM03-ED-50-R30.7/R31.7
Award Date02/25/2014
Closeout Date07/30/2015
Work DescriptionREPLACE BRIDGE.
Location DescriptionSLY PARK UNDERCROSSING
QA Service Level1 (Verified on 11/01/2013)

Sample Information

Sample Taken Date05/23/2014 Sample Unique Key13000954
Date that the sample was received by the laboratory/organization performing the testing05/28/2014 Sample typeVerification
A brief description of the sample6x12 concrete cylinders The quantity of what the sample constitutes8 Cylinders
From where was the sample collectedOther First name of sampler or witnessed byBrandon
Last name of sampler or witnessed byMiller Title of samplerSR
Telephone number of sampler(916) 505-6839 Laboratory sample identificationNot set
Linked DIME Sample IDNot set The fabricator/manufacturer/facility nameJobsite
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier25 0042 Structure nameSly Park Rd UC
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberF628AFST0
The truck number from where the sample was collected17 The batch plant ticket number from where the sample was collected1043371
Concrete batch plant1B The fabricator/manufacturer designation for the sampleNot set
A detailed description of where the material sample was collectedDischarge from concrete truck into wheelbarrow. Where the material sample would have been placed if not sampledStage 1 Abutment 1 Footing
From Lot No.Not set Bag Lot No.Not set

Test Details

DIME Sample ID: 2014-05-23-13000954
DIME Test ID: 2014-05-23-13000954-3
Testing Lab: CT D03 - Sacramento Sanders Structures Construction Field Office
Test Method: ASTM C138-10b: Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete
Test Release Date: 2014-06-06

Test Results


Input Type: Measured
Tester's full name: Brandon Miller
Date of test: 05/23/2014
Identification of concrete represented by the sample: F628AFST0 Stage 1 Abutment 1 Footing
Mass of the measure: 20.46 lb
Mass of the concrete and measure: 96.5 lb
Volume of concrete which the batch was designed to produce: 10 yd^3
Mass of cement in the batch: 5925 lb
Theoretical density of the concrete: 26.98 lb/ft^3
Total mass of all materials batched: 40258 lb
Volume of the measure: 0.500 ft^3
Mass of the concrete: 76.04 lb
Density of concrete: 152.1 lb/ft^3
Yield of concrete: 9.80 yd^3
Relative yield of the batch: 0.98
Cement content: 604.6 lb/ft^3
Air content: -463.8 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 6/6/2014 ✔