Summary for Test 2018-08-03-19-5

Test performed: CTM 504-June 2010

Project Information

Project IdentifiersProject ID: 209141
DEA: 07215954
EFIS: 0700001835
DIST-CO-RTE-PM07-LA-5-0.0/7.6
Award Date04/24/2014
Closeout Date07/14/2022
Work DescriptionWIDENING FREEWAY AND RECONSTRUCT OVERHEAD AND OVERCROSSING STRUCTURES
Location DescriptionLOS ANGELES COUNTY IN LA MIRADA, SANTA FE SPRINGS, NORWALK AND DOWNEY FROM ORANGE COUNTY/LOS ANGELES COUNTY LIMIT LINES TO 0.7 MILE NORTH OF ROUTE 605
QA Service Level1 (Verified on 06/02/2014)

Sample Information

Sample Taken Date08/03/2018 Sample Unique Key19
Date that the sample was received by the laboratory/organization performing the testing08/04/2018 Sample typeQuality Control
A brief description of the sample6x12 concrete cylinders The quantity of what the sample constitutes6
From where was the sample collectedJob Site First name of sampler or witnessed byHarold
Last name of sampler or witnessed byGreene Title of samplerField Technician
Telephone number of samplerUnknown Laboratory sample identificationSet 1
Linked DIME Sample IDUnknown The fabricator/manufacturer/facility nameJobsite
Transportation Laboratory (TL) NumberUnknown Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown
Structure unique identifierUnknown Structure nameUnknown
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberS62578
The truck number from where the sample was collectedTruck 406 Load 1 The batch plant ticket number from where the sample was collected0
Concrete batch plantUnknown The fabricator/manufacturer designation for the sampleSet 1
A detailed description of where the material sample was collectedWall Subunit 150 Where the material sample would have been placed if not sampledUnknown
From Lot No.Unknown Bag Lot No.Unknown

Test Details

DIME Sample ID: 2018-08-03-19
DIME Test ID: 2018-08-03-19-5
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2018-11-05

Test Results


Input Type: Calculated
Tester's full name: Harold Greene
Date of test: 08/03/2018
Air Content: 1.5 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 11/5/2018 ✔