Summary for Test 2018-10-01-12-2

Test performed: ASTM C1038-14b

Project Information

Project IdentifiersProject ID: 212577
DEA: 11408704
EFIS: 1112000017
DIST-CO-RTE-PM11-SD-8-9.0/15.3
Award Date10/31/2017
Closeout Date12/09/2019
Work DescriptionSLAB REPLACEMENT, COLD PLANE, GRIND PAVEMENT AND REPLACE GUARDRAIL.
Location DescriptionSAN DIEGO COUNTY FROM 0.6 MILE WEST OF LAKE MURRAY BOULEVARD OVERCROSSING IN SAN DIEGO TO JOHNSON AVENUE UNDERCROSSING IN EL CAJON
QA Service Level1 (Verified on 01/19/2018)

Sample Information

Sample Taken Date10/01/2018 Sample Unique Key12
Date that the sample was received by the laboratory/organization performing the testing10/01/2018 Sample typeDepartment Acceptance
A brief description of the sampleRapid Setting Cement The quantity of what the sample constitutes1 Bucket
From where was the sample collectedJob Site First name of sampler or witnessed byna
Last name of sampler or witnessed byna Title of samplerUnknown
Telephone number of samplerUnknown Laboratory sample identificationCM184801
Linked DIME Sample IDUnknown The fabricator/manufacturer/facility nameCMAX
Transportation Laboratory (TL) Numberna Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown
Structure unique identifierNot set Structure nameNot set
Bid ItemNot set

Material Information

Material TypeCementitious BrandCMAX
MillUnknown Type of Cementitious MaterialRapid Set Cement

Test Details

DIME Sample ID: 2018-10-01-12
DIME Test ID: 2018-10-01-12-2
Testing Lab: CT HQ - Sacramento Cement Testing Laboratory
Test Method: ASTM C1038-14b: Standard Test Method for Expansion of Hydraulic Cement Mortar Bars Stored in Water (Cement Mortar Bars)
Test Release Date: 2019-01-21

Test Results


Input Type: Measured
Tester's full name: Benjamin Lenz
Date of test: 10/29/2018
Specimen A Initial measurement at 24 hours: 0.2648 in
Specimen B Initial measurement at 24 hours: 0.2536 in
Specimen C Initial measurement at 24 hours: 0.3069 in
Specimen D Initial measurement at 24 hours: 0.2542 in
Specimen A Final measurement at 14 days: 0.2654 in
Specimen B Final measurement at 14 days: 0.2541 in
Specimen C Final measurement at 14 days: 0.3074 in
Specimen D Final measurement at 14 days: 0.2546 in
The average length of change of the four specimens: 0.05 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 1/14/2019 ✔