Summary for Test 2018-05-21-9-2

Test performed: AASHTO T30-15

Project Information

Project IdentifiersProject ID: 212996
DEA: 023H1404
DIST-CO-RTE-PM02-TRI,SHA-36-0.0/R3.5,0.0/4.0
Award Date02/28/2018
Closeout Date01/08/2019
Work DescriptionAC OVERLAY, REPLACE AC SURFACE, GUARDRAIL, SHOULDER BACKING
Location DescriptionSHASTA AND TRINITY COUNTIES FROM TRINITY COUNTY LINE TO 0.4 MILE EAST OF HARRISON GULCH ROAD AND FROM HUMBOLDT COUNTY LINE TO 0.2 MILE EAST OF MAD RIVER ROAD
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date05/21/2018 Sample Unique Key9
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/22/2018
Sample typeVerification A brief description of the sampleCombined RAP, 1/2-inch
The quantity of what the sample constitutesJMF Verification Renewal From where was the sample collectedManufacturer
First name of sampler or witnessed byDave Last name of sampler or witnessed byLockett
Title of samplerUnknown Telephone number of samplerUnknown
Laboratory sample identificationD77409 Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameTullis, Inc - Northstate Asphalt - Redding, CA Transportation Laboratory (TL) Number002140
Inspector Lot Number from the Transportation Laboratory (TL) FormJMF 17-04-R1 Structure unique identifierNot set
Structure nameNot set Bid ItemNot set

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceNorthstate Asphalt
Aggregate SizeCombined Aggregate SourceUnknown
RAP StockpileStatic Stockpile Size (tons)Unknown
Reclaimed Asphalt Pavement Mix NumberNot set HMA PayNo

Test Details

DIME Sample ID: 2018-05-21-9
DIME Test ID: 2018-05-21-9-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2018-09-27

Test Results


Input Type: Calculated
Tester's full name: NRML-R
Date of test: 05/29/2018
Cumulative percent passing the 2 in. sieve: no data
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 92.6 %
Cumulative percent passing the 3/8 in. sieve: 83.2 %
Cumulative percent passing the 1/4 in. sieve: 67 %
Cumulative percent passing the #4 sieve: 57.8 %
Cumulative percent passing the #8 sieve: 42.1 %
Cumulative percent passing the #16 sieve: 30.8 %
Cumulative percent passing the #30 sieve: 23 %
Cumulative percent passing the #50 sieve: 16.6 %
Cumulative percent passing the #100 sieve: 11.9 %
Cumulative percent passing the #200 sieve: 8.86 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 9/27/2018