Summary for Test 2018-09-12-2-1
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 213152 DEA: 032F5904 EFIS: 0300020624 |
|---|---|
| DIST-CO-RTE-PM | 03-YUB,NEV-20-20.1/21.7, 0.0/0.1 |
| Award Date | 05/21/2018 |
| Closeout Date | 12/06/2021 |
| Work Description | CURVE REALIGNMENT AND SHOULDER WIDENING |
| Location Description | YUBA AND NEVADA COUNTIES NEAR SMARTSVILLE FROM 0.5 MILE WEST OF MCGANNEY LANE TO MOONEY FLAT ROAD |
| QA Service Level | 1 (Verified on 04/24/2018) |
Sample Information
| Sample Taken Date | 09/12/2018 | Sample Unique Key | 2 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 09/13/2018 |
| Sample type | Quality Assurance | A brief description of the sample | number7 4foot 8inch hoops |
| The quantity of what the sample constitutes | 41 | From where was the sample collected | Fabricator |
| First name of sampler or witnessed by | Kevin | Last name of sampler or witnessed by | Muser |
| Title of sampler | QA | Telephone number of sampler | 9165170532 |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | CMC Tracy | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | S19-326-18 | Structure unique identifier | Not set |
| Structure name | Not set | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Welded Hoops | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Ultimate | Rebar Heat Number(s) | 4073439 |
| Hoop Manufacturer Lot Number(s) | 2 | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Size | 7 |
| Diameter of Hoop | 4'-8" | Epoxy Coated | No |
| Epoxy Coating Color | NA | Rebar Manufacturer | CMC |
| Welding Company | CMC | Coating Standards | Uncoated |
| Weld Type | Flash Welded |
Test Details
DIME Sample ID: 2018-09-12-2
DIME Test ID: 2018-09-12-2-1
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Test Release Date: 2018-09-20
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: Brian
Date of test: 09/13/2018
UTM: 400KIP
Temperature: 72 F
| Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|
| 1 | 1 | 2 | #7/22mm | 0.6 | 59260 | 98770 | Bar Broke | Brian |
General comments (publicly viewable) (Max 1000 characters): Bar Broke; OK Necking
Test Graph
Source: Partner Data Point FileTest graph for the Sample
Test was verified on 9/13/2018 ✔
