Summary for Test 2018-04-12-11-2
Test performed: AASHTO T30-15Project Information
| Project Identifiers | Project ID: 212497 DEA: 024E0204 EFIS: 0200020196 |
|---|---|
| DIST-CO-RTE-PM | 02-SHA-299-77.8/79.7 |
| Award Date | 02/01/2018 |
| Closeout Date | 08/14/2019 |
| Work Description | PULVERIZE AND RECONSTRUCT PAVEMENT, AND WIDEN WITH AB, HMA, & RHMA |
| Location Description | SHASTA COUNTY NEAR BURNEY FROM 0.2 MILE WEST OF SONOMA STREET TO 0.3 MILE WEST OF ROUTE 89 |
| QA Service Level | 1 (Verified on 06/06/2017) |
Sample Information
| Sample Taken Date | 04/12/2018 | Sample Unique Key | 11 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/13/2018 |
| Sample type | Verification | A brief description of the sample | RAP |
| The quantity of what the sample constitutes | JMF Verification | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Cindy | Last name of sampler or witnessed by | Bryant |
| Title of sampler | Unknown | Telephone number of sampler | Unknown |
| Laboratory sample identification | D77324B | Linked DIME Sample ID | Unknown |
| The fabricator/manufacturer/facility name | Hat Creek - Shaw Pit Facility | Transportation Laboratory (TL) Number | 853527 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | JMF 18-02-S1a | Structure unique identifier | Not set |
| Structure name | Not set | Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Shaw Pit |
|---|---|---|---|
| Aggregate Size | Unknown | Aggregate Source | Unknown |
| RAP Stockpile | Stockpile Size (tons) | Unknown | |
| Reclaimed Asphalt Pavement Mix Number | Not set | HMA Pay | No |
Test Details
DIME Sample ID: 2018-04-12-11
DIME Test ID: 2018-04-12-11-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2018-08-20
Test Results
Input Type: Calculated
Tester's full name: Darrell Valasek
Date of test: 04/17/2018
Cumulative percent passing the 2 in. sieve: no data
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 99.7 %
Cumulative percent passing the 1/4 in. sieve: 86.2 %
Cumulative percent passing the #4 sieve: 73.5 %
Cumulative percent passing the #8 sieve: 51 %
Cumulative percent passing the #16 sieve: 36.9 %
Cumulative percent passing the #30 sieve: 28.2 %
Cumulative percent passing the #50 sieve: 21.7 %
Cumulative percent passing the #100 sieve: 16.3 %
Cumulative percent passing the #200 sieve: 12.22 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/20/2018 ✔
