Summary for Test 2018-05-13-4-2

Test performed: AASHTO T30-15

Project Information

Project IdentifiersProject ID: 212574
DEA: 02368414
EFIS: 0215000066
DIST-CO-RTE-PM02-SHA-44-R4.6/R6.4
Award Date10/13/2017
Closeout Date11/24/2021
Work DescriptionCONSTRUCT OVERCROSSING, WIDEN WITH HMA AND AB, AND OVERLAY WITH HMA
Location DescriptionSHASTA COUNTY NEAR PALO CEDRO FROM CLOUGH CREEK BRIDGE TO 0.6 MILE WEST OF DESCHUTES ROAD UNDERCROSSING
QA Service Level1 (Verified on 07/28/2017)

Sample Information

Sample Taken Date05/13/2018 Sample Unique Key4
Date that the sample was received by the laboratory/organization performing the testing05/14/2018 Sample typeVerification
A brief description of the sampleCombined RAP, 1/2-inch The quantity of what the sample constitutesJMF Verification
From where was the sample collectedManufacturer First name of sampler or witnessed byAnthony
Last name of sampler or witnessed byOrtiz Title of samplerTET
Telephone number of samplerUnknown Laboratory sample identificationD77368B
Linked DIME Sample ID2018-05-13-2 The fabricator/manufacturer/facility nameTullis, Inc - Northstate Asphalt - Redding, CA
Transportation Laboratory (TL) Number896274 Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown
Structure unique identifierNot set Structure nameNot set
Bid ItemNot set

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceNorthstate Asphalt
Aggregate Size1/2-inch Aggregate SourceUnknown
RAP StockpileStatic Stockpile Size (tons)Unknown
Reclaimed Asphalt Pavement Mix NumberNot set HMA PayNo

Test Details

DIME Sample ID: 2018-05-13-4
DIME Test ID: 2018-05-13-4-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2018-07-16

Test Results


Input Type: Calculated
Tester's full name: Darrell Valasek
Date of test: 05/15/2018
Cumulative percent passing the 2 in. sieve: no data
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 93 %
Cumulative percent passing the 3/8 in. sieve: 82.8 %
Cumulative percent passing the 1/4 in. sieve: 67.3 %
Cumulative percent passing the #4 sieve: 57.8 %
Cumulative percent passing the #8 sieve: 41.6 %
Cumulative percent passing the #16 sieve: 30.3 %
Cumulative percent passing the #30 sieve: 22.4 %
Cumulative percent passing the #50 sieve: 16.2 %
Cumulative percent passing the #100 sieve: 11.7 %
Cumulative percent passing the #200 sieve: 8.83 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/16/2018 ✔