Summary for Test 2014-04-02-11304330-3
Test performed: ASTM C1064-08Project Information
| Project Identifiers | Project ID: 10016 DEA: 06342524 EFIS: 0600000381 |
|---|---|
| DIST-CO-RTE-PM | 06-FRE-180-R71.8/74.5 |
| Award Date | 04/23/2013 |
| Closeout Date | 10/19/2020 |
| Work Description | NEW EXPRESS HIGHWAY |
| Location Description | FRESNO COUNTY ABOUT 6.3 MILES EAST OF FRESNO FROM 0.6 MILE WEST OF QUALITY AVENUE TO 0.2 MILE WEST OF SMITH AVENUE |
| QA Service Level | 1 (Verified on 07/23/2013) |
Sample Information
| Sample Taken Date | 04/02/2014 | Sample Unique Key | 11304330 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 04/03/2014 | Sample type | Quality Control |
| A brief description of the sample | Type II Cement | The quantity of what the sample constitutes | 6 concrete cylinders |
| From where was the sample collected | Other | First name of sampler or witnessed by | Joshua |
| Last name of sampler or witnessed by | Guilmette | Title of sampler | QC Field Technician/Inspector |
| Telephone number of sampler | (559) 292-2188 | Laboratory sample identification | 2014-04-02-1130 |
| Linked DIME Sample ID | Not set | The fabricator/manufacturer/facility name | Ready Mix Plant-Sanger |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Hwy 180 at Fowler Switch Canal | Structure name | Hwy 180 at Fowler Switch Canal |
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | ND10530 |
|---|---|---|---|
| The truck number from where the sample was collected | 449487 | The batch plant ticket number from where the sample was collected | 111108971 |
| Concrete batch plant | 5111 | The fabricator/manufacturer designation for the sample | Plant |
| A detailed description of where the material sample was collected | Hwy 180 at Fowler Switch Canal | Where the material sample would have been placed if not sampled | Hwy 180 South Side at Lone Tree Canal |
| From Lot No. | Not set | Bag Lot No. | Not set |
Test Details
DIME Sample ID: 2014-04-02-11304330
DIME Test ID: 2014-04-02-11304330-3
Testing Lab: Trinity Engineering Laboratories, Incorporated - Fresno
Test Method: ASTM C1064-08: Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete
Test Release Date: 2014-05-22
Test Results
Input Type: Calculated
Tester's full name: Joshua Guilmette
Date of test: 04/02/2014
Temperature: 70 F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/22/2014 ✔
