Summary for Test 2018-05-22-13-4

Test performed: SMTL BILST-06

Project Information

Project IdentifiersProject ID: 213003
DEA: 044G8104
EFIS: 0413000055
DIST-CO-RTE-PM04-CC-242-R1.6
Award Date03/13/2018
Closeout Date02/22/2019
Work DescriptionSTRUCTURE REHABILITATION AND BRIDGE RAILING REPLACEMENT.
Location DescriptionCONTRA COSTA COUNTY IN CONCORD AT BUCHANAN FIELD VIADUCT
QA Service Level1 (Verified on 03/30/2018)

Sample Information

Sample Taken Date05/22/2018 Sample Unique Key13
Date that the sample was received by the laboratory/organization performing the testing06/01/2018 Sample typeQuality Assurance
A brief description of the sampleBearing Pad The quantity of what the sample constitutes1
From where was the sample collectedManufacturer First name of sampler or witnessed byPete
Last name of sampler or witnessed byEtcheverry Title of samplerUnknown
Telephone number of samplerUnknown Laboratory sample identificationUnknown
Linked DIME Sample IDUnknown The fabricator/manufacturer/facility nameScougal Rubber
Transportation Laboratory (TL) NumberNA Inspector Lot Number from the Transportation Laboratory (TL) FormNA
Structure unique identifierNot set Structure nameNot set
Bid ItemNot set

Material Information

Material TypeSMTL TM1 - Elastomeric Bearing Pad Mfg. Lot Number(s)16717-1
Material/Compound/Elastomer IDNA Samples Representing21
Description (size)3" x 16" x 16" CommentsUnknown
Description (Number of Shims)6 Type of Bearing PadSteel
Description (Thickness of Shims)14 gage Manufacturer(s)Scougal Rubber
Batch NumberNA

Test Details

DIME Sample ID: 2018-05-22-13
DIME Test ID: 2018-05-22-13-4
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: SMTL BILST-06: (Neoprene Verification) Bilstein Test
Test Release Date: 2018-06-14

Test Results


Input Type: Measured
Tester's full name: Glen Weldon
Date of test: 06/06/2018
Result: Pass
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 6/7/2018 ✔