Summary for Test 2026-09-15-64-8
Test performed: AASHTO T240-23Project Information
| Project Identifiers | Project ID: 1001246 DEA: 041Q7214 EFIS: 0423000277 |
|---|---|
| DIST-CO-RTE-PM | 04-CC,CC,SOL-580,680,780-Var |
| Award Date | 09/25/2025 |
| Closeout Date | Not set |
| Work Description | INSTALL FIBER OPTIC CABLE SYSTEM, RAMP METERING, AND WIDEN ROADWAY. |
| Location Description | ALAMEDA, CONTRA COSTA AND SOLANO COUNTIES AT VARIOUS LOCATIONS |
| QA Service Level | 1 (Verified on 08/13/2025) |
Sample Information
| Sample Taken Date | 09/15/2026 | Sample Unique Key | 64 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 09/22/2026 | Sample type | Production Start-Up |
| A brief description of the sample | 2 cans of PG 58-22 | The quantity of what the sample constitutes | 2 cans |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Dennis |
| Last name of sampler or witnessed by | Yeung | Title of sampler | TE |
| Telephone number of sampler | Laboratory sample identification | 8 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Vulcan- Pleasanton | |
| Transportation Laboratory (TL) Number | CPL091526-2 | Inspector Lot Number from the Transportation Laboratory (TL) Form | CPL091526-2 |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 58-22 |
|---|---|---|---|
| Modified | Lot number | ||
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | Vulcan- Pleasanton | |
| Certified Asphalt Supplier | Pacific Northwest Oil - Stockton CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number | ||
| HMA Type | 3/4" HMA-A 25% RAP | HMA Supplier Mix ID Number | NOT ON TL101 |
Test Details
DIME Sample ID: 2026-09-15-64
DIME Test ID: 2026-09-15-64-8
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2026-10-21
Test Results
Is mass change based on one or two containers?: Two
Is mass change correction factor needed?: Yes
Input Type: Measured
Tester's full name: Erik Svensson
Date of test: 10/21/2026
Any material loss from containers during heating process/testing?: no data
Mass of container #1 before test (m1i): 202.491 grams
Mass of container #2 before test (m2i): 207.006 grams
Mass of container #1 after test (m1f): 202.367 grams
Mass of container #2 after test (m2f): 206.881 grams
Mass of empty container #1: 167.479 grams
Mass of empty container #2: 171.935 grams
Mass correction factor: 0.006
Average mass change: -0.349 percent
General comments (publicly viewable) (Max 1000 characters): MASS CHANGE
Test was verified on 10/21/2026 ✔