Summary for Test 2026-10-07-46-1

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 1000754
DEA: 081J3104
EFIS: 0818000018
DIST-CO-RTE-PM08-SBD-18-34.0/44.3
Award Date08/08/2025
Closeout DateNot set
Work DescriptionCSP, STRUCTURAL CONCRETE, AND CMS SYSTEM.
Location DescriptionSAN BERNARDINO COUNTY NEAR BIG BEAR LAKE AT VARIOUS LOCATIONS FROM ARROWBEAR DRIVE TO ROUTE 38
QA Service Level1 (Verified on 09/01/2025)

Sample Information

Sample Taken Date10/07/2026 Sample Unique Key46
Date that the sample was received by the laboratory/organization performing the testing10/07/2026 Sample typeAcceptance
A brief description of the sampleStr. Backfill The quantity of what the sample constitutes25.6 kg
From where was the sample collectedJob Site First name of sampler or witnessed byMaryAnna
Last name of sampler or witnessed byLandaverde Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameCTM 231 TEST LOCATION
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sample
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedEB SR-18 @ PM 34.60, Sta 149+50, South Side Deep Creek Bridge Embankment Lift 2 FG
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2026-10-07-46
DIME Test ID: 2026-10-07-46-1
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2026-10-13

Test Results


Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: MaryAnna Landaverde
Date of test: 10/07/2026
Gage No.: 36636
Test No.: 2
Nuclear By: MaryAnna Landaverde
Non-Bias Plan No.: 5
Depth: 8"
Material No.: no data
Material Type: Structural Backfill
Impact By: Gabriel Ramirez
Standard Count Density: 1671 g/cc
Count or Density 1: 960 g/cc
Count or Density 2: 1082 g/cc
Count or Density 3: 1145 g/cc
Standard Count Moisture: 642 g/cc
Moisture Count 1: 112 g/cc
Moisture Count 2: 96 g/cc
Moisture Count 3: 95 g/cc
Sum of Count or Density: 3187 g/cc
Average of Count or Density: 1062 g/cc
Sum of Moisture Count: 303 g/cc
Average of Moisture Count: 101 g/cc
Count Ratio Density: 0.64
Count Ratio Moisture: 0.16
Calculated Percent Relative Compaction: 94.5 %
Reported Percent Relative Compaction: 95 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 10/13/2026 ✔