Summary for Test 2026-10-13-3-1

Test performed: CTM 552-December 2013

Project Information

Project IdentifiersProject ID: 1002474
DEA: 043Y5804
EFIS: 0423000263
DIST-CO-RTE-PM04-CC-580-0/R5.1
Award DateNot set
Closeout DateNot set
Work DescriptionCONSTRUCTION ON STATE HIGHWAY IN CONTRA COSTA COUNTY IN RICHMOND AT VARIOUS LOCATIONS FROM 0.2 MILE SOUTH OF CENTRAL AVENUE OVERCROSSING TO CASTRO STREET UNDERCROSSING
Location DescriptionRoute 580
QA Service Level1 (Verified on 09/11/2026)

Sample Information

Sample Taken Date10/13/2026 Sample Unique Key3
Date that the sample was received by the laboratory/organization performing the testing10/13/2026 Sample typeAcceptance
A brief description of the samplePOLYESTER CONCRTE COMPACTION TEST The quantity of what the sample constitutes5 tests
From where was the sample collectedJob Site First name of sampler or witnessed byIgnacio
Last name of sampler or witnessed byArechiga Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility name580 HWY Castro ST Overpass
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypePolyester Mfg. Lot Number(s)#1 test first 200ft
Batch Number#1 Mix number123

Test Details

DIME Sample ID: 2026-10-13-3
DIME Test ID: 2026-10-13-3-1
Testing Lab: CT D04 - Richmond Field Laboratory
Test Method: CTM 552-December 2013: Method of Test for Relative Compaction of Polymer Concrete Utilizing Nuclear Gages
Test Release Date: 2026-10-13

Test Results


Input Type: Calculated
Tester's full name: IGNACIO ARECHIGA
Date of test: 10/13/2026
Gage No.: 691
Time of test: 12:00 HH:MM
Standard Density: 2.42 g/cc
In-Place Density: 2.31 g/cc
Percent Relative Compaction: 96 %
General comments (publicly viewable) (Max 1000 characters): #1 first 200ft

Test was verified on 10/13/2026 ✔