Summary for Test 2026-10-08-32-2

Test performed: AASHTO T30-25

Project Information

Project IdentifiersProject ID: 1001723
DEA: 050N7064
EFIS: 0524000077
DIST-CO-RTE-PM05-SB-101-10.9/12.3
Award DateNot set
Closeout DateNot set
Work DescriptionSB 101 - Segment 4E North - Cabrillo
Location DescriptionNot set
QA Service Level1 (Verified on 11/03/2025)

Sample Information

Sample Taken Date10/08/2026 Sample Unique Key32
Date that the sample was received by the laboratory/organization performing the testing10/08/2026 Sample typeQuality Assurance
A brief description of the sample3/4 HMA SP R25 The quantity of what the sample constitutes750 Tons
From where was the sample collectedSupplier First name of sampler or witnessed byjesse
Last name of sampler or witnessed byGomez Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameGranite Santa Paula
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number
Sublot number HMA Mix Number
Binder content (%)0.0 Virgin binder PG
Design binder PG Binder Supplier
RAP content (%)Not set WMA Additives
Antistrip type

Test Details

DIME Sample ID: 2026-10-08-32
DIME Test ID: 2026-10-08-32-2
Testing Lab: CT D05 - Carpinteria Field Laboratory
Test Method: AASHTO T30-25: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2026-10-13

Test Results


Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Has the fine aggregate sample been reduced?: Yes
Is an aggregate correction factor used?: Yes
Was the aggregate obtained using ASTM D8159?: Yes
Input Type: Calculated
Tester's full name: Michael Bennett
Date of test: 10/09/2026
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 99 %
Cumulative percent passing the 1/2 in. sieve: 94 %
Cumulative percent passing the 3/8 in. sieve: 85 %
Cumulative percent passing the #4 sieve: 61 %
Cumulative percent passing the #8 sieve: 43 %
Cumulative percent passing the #16 sieve: 31 %
Cumulative percent passing the #30 sieve: 22 %
Cumulative percent passing the #50 sieve: 14 %
Cumulative percent passing the #100 sieve: 8 %
Cumulative percent passing the #200 sieve: 4.4 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 10/13/2026 ✔