Summary for Test 2026-10-05-48-7
Test performed: AASHTO T308-25Project Information
| Project Identifiers | Project ID: 1001609 DEA: 040AA244 EFIS: 0419000455 |
|---|---|
| DIST-CO-RTE-PM | 04-CC, -680-R0.0/R7.7 |
| Award Date | 12/18/2025 |
| Closeout Date | Not set |
| Work Description | INDIVIDUAL SLAB REPLACEMENT, COLD PLAN AC PVMT, GRIND EXIST CONC PVMT. |
| Location Description | CONTRA COSTA COUNTY IN SAN RAMON AND DANVILLE FROM THE ALAMEDA COUNTY LINE TO 0.2 MILE NORTH OF DIABLO ROAD UNDERCROSSING |
| QA Service Level | 1 (Verified on 10/06/2025) |
Sample Information
| Sample Taken Date | 10/05/2026 | Sample Unique Key | 48 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 10/06/2026 | Sample type | Acceptance |
| A brief description of the sample | 1/2"RHMA-G | The quantity of what the sample constitutes | 750 Tons |
| From where was the sample collected | Source | First name of sampler or witnessed by | Dennis |
| Last name of sampler or witnessed by | Yeung | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Vulcan Pleasanton Plant | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 1/2 inch | Lot number | |
| Sublot number | HMA Mix Number | ||
| Binder content (%) | 7.5 | Virgin binder PG | PG 64-16 |
| Design binder PG | PG 64-16 | Binder Supplier | |
| RAP content (%) | Not set | WMA Additives | Yes |
| Antistrip type |
Test Details
DIME Sample ID: 2026-10-05-48
DIME Test ID: 2026-10-05-48-7
Testing Lab: CT D04 - Pleasanton Field Laboratory
Test Method: AASHTO T308-25: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2026-10-12
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Robert Lohman
Date of test: 10/09/2026
Test procedure used?: Method A
Mass of the specimen basket assembly: 2873.3 g
Mass of the specimen and specimen basket assembly prior to ignition: 4432.7 g
Mass of HMA Sample prior to ignition: 1559.4 g
Mass Loss: 125.4 g
Mass of aggregate remaining after ignition: 1434.0 g
Correction Factor (Percent by mass of HMA Specimen): 0.40 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.19 %
Test Temperature: 482 C
Corrected Asphalt Binder Content: 7.45 %
General comments (publicly viewable) (Max 1000 characters): Lot 1 SL. 4
Test was verified on 10/12/2026 ✔
