Summary for Test 2026-10-07-9-1

Test performed: CTM 342-August 2012

Project Information

Project IdentifiersProject ID: 993446
DEA: 120J34U4
EFIS: 1218000034
DIST-CO-RTE-PM12-ORA-55,55-29.6,R6.4/10.3
Award Date05/27/2022
Closeout DateNot set
Work DescriptionCONSTR BRIDGES, RW, SW, JPCP, HMA PVMT, DRAINAGE AND ELECT SYSTEMS.
Location DescriptionORANGE COUNTY IN IRVINE, SANTA ANA, AND TUSTIN ON ROUTE 5 AT NEWPORT AVENUE UNDERCROSSING AND ON ROUTE 55 FROM 0.4 MILE NORTH OF ROUTE 55/405 SEPARATION TO 0.1 MILE SOUTH OF ROUTE 5/55 SEPARATION
QA Service Level1 (Verified on 06/24/2022)

Sample Information

Sample Taken Date10/07/2026 Sample Unique Key9
Date that the sample was received by the laboratory/organization performing the testing10/08/2026 Sample typeQuality Assurance
A brief description of the sampleSkid Testing Request The quantity of what the sample constitutesMultiple Lanes on Bridge
From where was the sample collectedJob Site First name of sampler or witnessed byCal
Last name of sampler or witnessed byZachman Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameSecurity Paving
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier55-0409 Structure nameDyer Road UC
Bid Item3860247

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypePCC (Portland Cement Concrete)
Type of Traffic Control ProvidedStationary Lane Closure DIST-CO-RTE12-ORA-55
Direction of TravelNorth Post Mile
Lanes to be TestedShoulder,Lane #1,Lane #2 Station

Test Details

DIME Sample ID: 2026-10-07-9
DIME Test ID: 2026-10-07-9-1
Testing Lab: CT D08 - SRL Specialty Testing Unit 4101
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2026-10-09

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: Jose Guzman
Date of test: 10/08/2026
Air Temperature: 81
Tire Pressure: 25
Equipment PST #: 1000-3
Is Calibration within ± values: Yes
Weather: Clear
Direction/Lane #: NB: Northbound Direction of Travel
Edge used to measure reference distance: Begin of bridge
Edge used to measure position: Left of jersey wall
Reference Distance 1: 14'
Reference Distance 2: 16'
Reference Distance 3: 18'
Direction and Lane # for Stationing 1: NB shoulder
Direction and Lane # for Stationing 2: NB shoulder
Direction and Lane # for Stationing 3: NB shoulder
Position for Stationing 1: 18
Position for Stationing 2: 18
Position for Stationing 3: 18
Percent Grade for 1st Stationing: 1.0
Percent Grade for 2nd Stationing: 1.0
Percent Grade for 3rd Stationing: 1.0
Corrected Coefficients of Friction for Stationing 1: 0.35
Corrected Coefficients of Friction for Stationing 2: 0.37
Corrected Coefficients of Friction for Stationing 3: 0.37
Average Coefficient of Friction: 0.36
General comments (publicly viewable) (Max 1000 characters): Dyer Rd UC 55-0409 Bridge deck meets specs

Test was verified on 10/9/2026 ✔