Summary for Test 2026-09-23-21-2

Test performed: CTM 342-August 2012

Project Information

Project IdentifiersProject ID: 1002030
DEA: 020J7604
EFIS: 0219000157
DIST-CO-RTE-PM02-TRI-3-67.7/T85.06
Award Date02/18/2026
Closeout DateNot set
Work DescriptionTangle Blue CAPM
Location DescriptionNot set
QA Service Level1 (Verified on 04/06/2026)

Sample Information

Sample Taken Date09/23/2026 Sample Unique Key21
Date that the sample was received by the laboratory/organization performing the testing09/23/2026 Sample typeAcceptance
A brief description of the sampleBridge Deck and Approach slabs The quantity of what the sample constitutesONE LANE
From where was the sample collectedJob Site First name of sampler or witnessed byNicolas
Last name of sampler or witnessed byJimenez Title of samplerCT STRUCTURE REP
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameJF Shea Construction
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier05-0033 Structure nameCoffee Creek Overflow
Bid Item3951491

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypeRSC (Rapid Strength Concrete)
Type of Traffic Control ProvidedBehind K-Rail/Barrier DIST-CO-RTE02-Tri-3
Direction of TravelNorth Post Mile67.98
Lanes to be TestedLane #1 Station

Test Details

DIME Sample ID: 2026-09-23-21
DIME Test ID: 2026-09-23-21-2
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2026-10-07

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: HARISH THAKUR
Date of test: 10/07/2026
Air Temperature: 62
Tire Pressure: 25
Equipment PST #: 10007/1008
Is Calibration within ± values: Yes
Weather: WARM
Direction/Lane #: NB: Northbound Direction of Travel
Edge used to measure reference distance: BEGIN APPROACH SLAB
Edge used to measure position: LEFT OF WALL
Reference Distance 1: 3
Reference Distance 2: 6
Reference Distance 3: 9
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 5
Position for Stationing 2: 5
Position for Stationing 3: 5
Percent Grade for 1st Stationing: 0.0
Percent Grade for 2nd Stationing: 0.0
Percent Grade for 3rd Stationing: 0.0
Corrected Coefficients of Friction for Stationing 1: 0.43
Corrected Coefficients of Friction for Stationing 2: 0.44
Corrected Coefficients of Friction for Stationing 3: 0.44
Average Coefficient of Friction: 0.44
General comments (publicly viewable) (Max 1000 characters): INSPECTED ENTIRE APPROACH SLAB, ALL LOOKS UNIFORMED. TESTED DEPARTURE SLAB WHICH ALSO COMPLIES WITH AN .43 AVG.

Test was verified on 10/7/2026 ✔