Summary for Test 2026-08-21-58-3
Test performed: CTM 217-June 2011Project Information
| Project Identifiers | Project ID: 1001444 DEA: 11430314 EFIS: 1118000095 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-67-R4.1/15.9 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | CULVERT RESTORATION, REPLACE SIGNS, ADA CURB RAMPS, AND LED LIGHTING. |
| Location Description | SAN DIEGO COUNTY FROM 0.2 MILE NORTH OF RIVERFORD ROAD AT LAKESIDE TO ELLIE LANE IN POWAY |
| QA Service Level | 1 (Verified on 08/04/2025) |
Sample Information
| Sample Taken Date | 08/21/2026 | Sample Unique Key | 58 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 07/15/2026 | Sample type | Quality Assurance |
| A brief description of the sample | Concrete Aggregates | The quantity of what the sample constitutes | 3 bags |
| From where was the sample collected | Supplier | First name of sampler or witnessed by | Gerardo |
| Last name of sampler or witnessed by | Cordero | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Robertson's El Cajon | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | Not Provided |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Plant | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1 inch | |
| The concrete mix design number | RRM 20047 | Lot number | |
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2026-08-21-58
DIME Test ID: 2026-08-21-58-3
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2026-10-02
Test Results
Number of tests: 1
Input Type: Measured
Tester's full name: Francisco Ruvalcaba
Date of test: 09/28/2026
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 5.2
Sand reading (test 1): 4.2
Sand equivalent (test 1): 81
Sand equivalent before temperature correction: 81
Sand equivalent after temperature correction: 81
General comments (publicly viewable) (Max 1000 characters): SE
Test was verified on 10/2/2026 ✔
