Summary for Test 2026-08-17-11-4
Test performed: CTM 217-June 2011Project Information
| Project Identifiers | Project ID: 1001625 DEA: 11173704 EFIS: 1100020255 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-805-2.6/3.2 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | WIDEN INTERCHANGE, STRUCTURES, HMA-A, RHMA-G, LANDSCAPE, & ELECTRICAL. |
| Location Description | SAN DIEGO COUNTY IN SAN DIEGO FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF PALM AVENUE OVERCROSSING |
| QA Service Level | 1 (Verified on 03/04/2026) |
Sample Information
| Sample Taken Date | 08/17/2026 | Sample Unique Key | 11 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 08/17/2026 | Sample type | Quality Assurance |
| A brief description of the sample | CTB | The quantity of what the sample constitutes | 1 bag |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Daniel Paul |
| Last name of sampler or witnessed by | Smith | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | CTB | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | Palm Ridge Parking Lot | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2026-08-17-11
DIME Test ID: 2026-08-17-11-4
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2026-10-02
Test Results
Number of tests: 3
Input Type: Measured
Tester's full name: Shawn Rivers
Date of test: 10/01/2026
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 5.7
Sand reading (test 1): 3.4
Clay reading (test 2): 4.7
Sand reading (test 2): 3.4
Clay reading (test 3): 6.5
Sand reading (test 3): 3.5
Sand equivalent (test 1): 60
Sand equivalent (test 2): 73
Sand equivalent (test 3): 54
Sand equivalent before temperature correction: 63
Sand equivalent after temperature correction: 63
General comments (publicly viewable) (Max 1000 characters): Complies
Test was verified on 10/2/2026 ✔
