Summary for Test 2026-09-30-6-2
Test performed: CTM 504-June 2010Project Information
| Project Identifiers | Project ID: 1001403 DEA: 11430824 EFIS: 1119000162 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-5-R66.2/R67.4 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | PCC & HMA PAVING, SIGNS AND STRIPING, WSMS & AUTOMATED LANE CLOSURE. |
| Location Description | SAN DIEGO COUNTY ABOUT 12 MILES NORTH OF OCEANSIDE FROM 1.2 MILES SOUTH OF SAN ONOFRE COMMERCIAL VEHICLE ENFORCEMENT FACILITIES TO SAN ONOFRE COMMERCIAL VEHICLE ENFORCEMENT FACILITIES |
| QA Service Level | 1 (Verified on 08/04/2025) |
Sample Information
| Sample Taken Date | 09/30/2026 | Sample Unique Key | 6 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 09/25/2026 | Sample type | Quality Assurance |
| A brief description of the sample | CRCP | The quantity of what the sample constitutes | 3 cylinders |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Daniel Paul |
| Last name of sampler or witnessed by | Smith | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Robertson's San Clemente | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | RRM 24043 |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 1 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | CRCP | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2026-09-30-6
DIME Test ID: 2026-09-30-6-2
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2026-10-02
Test Results
Input Type: Calculated
Tester's full name: Daniel Smith
Date of test: 10/01/2026
Air Content: 1.2 %
General comments (publicly viewable) (Max 1000 characters): Complies Target 1.5 ( +/-* 1.0% )
Test was verified on 10/2/2026 ✔
