Summary for Test 2026-08-28-51-1
Test performed: CTM 518-June 2010Project Information
| Project Identifiers | Project ID: 1000970 DEA: 031J6304 EFIS: 0321000023 |
|---|---|
| DIST-CO-RTE-PM | 03-SAC-99-6.04/7.06 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | WILLOW SLOUGH REPLACEMENT |
| Location Description | SACRAMENTO COUNTY NEAR ELK GROVE FROM 0.2 MILE NORTH OF ARNO ROAD TO 0.4 MILE SOUTH OF DILLARD ROAD |
| QA Service Level | 1 (Verified on 02/13/2025) |
Sample Information
| Sample Taken Date | 08/28/2026 | Sample Unique Key | 51 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 08/28/2026 | Sample type | Quality Control |
| A brief description of the sample | Concrete | The quantity of what the sample constitutes | 100 cy |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Fikra |
| Last name of sampler or witnessed by | Jahya | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Folsom Ready Mix | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | C62A4D1 |
|---|---|---|---|
| The truck number from where the sample was collected | 97 | The batch plant ticket number from where the sample was collected | 1298324 |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | concrete truck | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2026-08-28-51
DIME Test ID: 2026-08-28-51-1
Testing Lab: RMA Group - Rancho Cordova
Test Method: CTM 518-June 2010: Method of Test for Unit Weight of Fresh Concrete
Test Release Date: 2026-09-30
Test Results
Input Type: Calculated
Tester's full name: Fikra Jahya
Date of test: 08/28/2026
Unit weight of the concrete: 150 lb/ft^3
Cement content: 0 lb/yd^3
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/30/2026 ✔