Summary for Test 2026-09-30-8-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 215479 DEA: 080R4204 EFIS: 0812000076 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-SR 210 AND I-15 IC-Null |
| Award Date | 04/02/2021 |
| Closeout Date | 12/10/2024 |
| Work Description | FONTANA MAINTENANCE STATION |
| Location Description | 14032 Victoria Street, Fontana, CA 92336 |
| QA Service Level | 1 (Verified on 02/11/2021) |
Sample Information
| Sample Taken Date | 09/30/2026 | Sample Unique Key | 8 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 09/30/2026 | Sample type | Acceptance |
| A brief description of the sample | Native Backfill | The quantity of what the sample constitutes | kg |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Gabriel |
| Last name of sampler or witnessed by | Ramirez | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | CTM 231 TEST LOCATION | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | New Fontana CT Maintenance Facility, Emergency Building, Elev. 1338.6', Lift 4 | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2026-09-30-8
DIME Test ID: 2026-09-30-8-1
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2026-09-30
Test Results
Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: Yes
Input Type: Measured
Tester's full name: Gabriel Ramirez
Date of test: 09/30/2026
Gage No.: 36636
Test No.: 2
Nuclear By: Gabriel Ramirez
Non-Bias Plan No.: 8
Depth: 8"
Material No.: no data
Material Type: Structural Backfill
Impact By: no data
Standard Count Density: 1676 g/cc
Count or Density 1: 679 g/cc
Count or Density 2: 705 g/cc
Count or Density 3: 784 g/cc
Standard Count Moisture: 648 g/cc
Moisture Count 1: 116 g/cc
Moisture Count 2: 104 g/cc
Moisture Count 3: 92 g/cc
Density: 2.29
Moisture: 0.12
Sum of Count or Density: 2168 g/cc
Average of Count or Density: 723 g/cc
Sum of Moisture Count: 312 g/cc
Average of Moisture Count: 104 g/cc
Count Ratio Density: 0.43
Count Ratio Moisture: 0.16
Calculated Percent Relative Compaction: 98.1 %
Reported Percent Relative Compaction: 98 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/30/2026 ✔
