Summary for Test 2026-09-01-32-4

Test performed: SMTL BILST-06

Project Information

Project IdentifiersProject ID: 1001625
DEA: 11173704
EFIS: 1100020255
DIST-CO-RTE-PM11-SD-805-2.6/3.2
Award DateNot set
Closeout DateNot set
Work DescriptionWIDEN INTERCHANGE, STRUCTURES, HMA-A, RHMA-G, LANDSCAPE, & ELECTRICAL.
Location DescriptionSAN DIEGO COUNTY IN SAN DIEGO FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF PALM AVENUE OVERCROSSING
QA Service Level1 (Verified on 03/04/2026)

Sample Information

Sample Taken Date09/01/2026 Sample Unique Key32
Date that the sample was received by the laboratory/organization performing the testing09/09/2026 Sample typeQuality Assurance
A brief description of the sampleBearing Pad w/shims The quantity of what the sample constitutes15
From where was the sample collectedManufacturer First name of sampler or witnessed byDavid
Last name of sampler or witnessed bySimon Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameDS Brown
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM1 - Elastomeric Bearing Pad Mfg. Lot Number(s)1093591-1103-1A
Material/Compound/Elastomer IDNA Samples Representing15
Description (size)0 Comments
Description (Number of Shims)0 Type of Bearing PadSteel
Description (Thickness of Shims)14 gage Manufacturer(s)DS Brown
Batch NumberNA

Test Details

DIME Sample ID: 2026-09-01-32
DIME Test ID: 2026-09-01-32-4
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: SMTL BILST-06: (Neoprene Verification) Bilstein Test
Test Release Date: 2026-09-30

Test Results


Input Type: Calculated
Tester's full name: Andrew Auvinen
Date of test: 09/29/2026
Result: Pass
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 9/30/2026 ✔