Summary for Test 2026-08-20-83-4

Test performed: AASHTO T30-25

Project Information

Project IdentifiersProject ID: 1001683
DEA: 040AA194
EFIS: 0419000450
DIST-CO-RTE-PM04-CC-4-R29.0/R44.4
Award Date01/09/2026
Closeout DateNot set
Work DescriptionCOLD PLANE AC PVMT, RHMA-G & HMA OVERLAY, REPLACE AC SURF, & MGS.
Location DescriptionCONTRA COSTA COUNTY IN ANTIOCH AND AT BYRON FROM HILLCREST AVENUE OVERCROSSING TO BYRON HIGHWAY
QA Service Level1 (Verified on 10/06/2025)

Sample Information

Sample Taken Date08/20/2026 Sample Unique Key83
Date that the sample was received by the laboratory/organization performing the testing08/21/2026 Sample typeQuality Assurance
A brief description of the sample1/2" RHMA-G The quantity of what the sample constitutes750 Tons
From where was the sample collectedSupplier First name of sampler or witnessed byDanny
Last name of sampler or witnessed byEstrada Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameTeichert Vernalis
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeHot Mix Asphalt HMA TypeRHMA-G
HMA Grading1/2 inch Lot number5
Sublot number3 HMA Mix Number
Binder content (%)0.0 Virgin binder PG
Design binder PG Binder Supplier
RAP content (%)Not set WMA Additives
Antistrip type

Test Details

DIME Sample ID: 2026-08-20-83
DIME Test ID: 2026-08-20-83-4
Testing Lab: CT D04 - Concord Field Laboratory
Test Method: AASHTO T30-25: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2026-09-25

Test Results


Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Has the fine aggregate sample been reduced?: No
Is an aggregate correction factor used?: Yes
Was the aggregate obtained using ASTM D8159?: No
Input Type: Calculated
Tester's full name: Henry Concepcion
Date of test: 08/21/2026
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 94 %
Cumulative percent passing the 3/8 in. sieve: 83 %
Cumulative percent passing the #4 sieve: 43 %
Cumulative percent passing the #8 sieve: 21 %
Cumulative percent passing the #16 sieve: 13 %
Cumulative percent passing the #30 sieve: 10 %
Cumulative percent passing the #50 sieve: 7 %
Cumulative percent passing the #100 sieve: 6 %
Cumulative percent passing the #200 sieve: 4.7 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 9/25/2026 ✔