Summary for Test 2026-09-08-40-1
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 1001469 DEA: 120K62U4 EFIS: 1224000090 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA,-5-R25.8/30.3 |
| Award Date | 11/12/2025 |
| Closeout Date | Not set |
| Work Description | CONST BRIDGE, RW, SW, PAVEMENT, DRAINAGE, AND ELECTRICAL SYSTEMS. |
| Location Description | ORANGE COUNTY IN IRVINE AND TUSTIN FROM YALE AVENUE OVERCROSSING TO ROUTE 5/55 SEPARATION |
| QA Service Level | 1 (Verified on 08/13/2025) |
Sample Information
| Sample Taken Date | 09/08/2026 | Sample Unique Key | 40 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 09/16/2026 | Sample type | Quality Assurance |
| A brief description of the sample | HRC 500/510 #9 Couplera | The quantity of what the sample constitutes | 4 |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Phil |
| Last name of sampler or witnessed by | Lattuca | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Field | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Ultimate | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Manufacturer | CMC |
| Coupler Manufacturer | HRC | Intermediate Assembler or Fabricator | |
| Rebar Size | #9 | Coupler Model | HRC 500/510 |
| Coating Standards | Uncoated | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
| Coupler Component Heat/Lot Number(s) | 73140308, 73140828 | Rebar Heat Number(s) | 9013148 |
| Rebar Size 2 | Coupler Unique ID | TP-17-03 |
Test Details
DIME Sample ID: 2026-09-08-40
DIME Test ID: 2026-09-08-40-1
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Test Release Date: 2026-09-24
Test Results
Number of Samples: 4
Input Type: Measured
Tester's full name: Steven Paine
Date of test: 09/24/2026
UTM: NA
Halo ID: na
Temperature: 0 f
| Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|---|
| 1 | 1 | 1 | 9 | 1 | 0.010 | 96160 | 96000 | ok necking | Kleinfelder |
| 2 | 2 | 1 | 9 | 1 | 0000 | 92110 | 92000 | ok necking | Kleinfelder |
| 3 | 3 | 1 | 9 | 1 | 0000 | 90820 | 91000 | ok necking | Kleinfelder |
| 4 | 4 | 1 | 9 | 1 | 0000 | 95460 | 95500 | ok necking | Kleinfelder |
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/24/2026 ✔
