Summary for Test 2026-09-15-8-1

Test performed: CTM 342-August 2012

Project Information

Project IdentifiersProject ID: 1001169
DEA: 07314524
EFIS: 0722000300
COOP: 075283
DIST-CO-RTE-PM07---
Award Date07/03/2023
Closeout DateNot set
Work DescriptionI-105 METRO Express Lanes Project
Location DescriptionLA-105 PM R0.6/R10.1, LA-110 PM R14.1/R16.6
QA Service Level2 (Verified on 04/11/2025)

Sample Information

Sample Taken Date09/15/2026 Sample Unique Key8
Date that the sample was received by the laboratory/organization performing the testing09/15/2026 Sample typeAcceptance
A brief description of the sampleSkid Test Request The quantity of what the sample constitutesSkid Test Request
From where was the sample collectedJob Site First name of sampler or witnessed bySANCHIT
Last name of sampler or witnessed byPOUDEL Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameFlatiron Dragados
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypePCC (Portland Cement Concrete)
Type of Traffic Control ProvidedBehind K-Rail/Barrier DIST-CO-RTE07-LA-105
Direction of TravelWest Post Mile8.06
Lanes to be TestedShoulder Station

Test Details

DIME Sample ID: 2026-09-15-8
DIME Test ID: 2026-09-15-8-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2026-09-22

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: Eddie Bidinger
Date of test: 09/22/2026
Air Temperature: 81
Tire Pressure: 25
Equipment PST #: 1000-3
Is Calibration within ± values: Yes
Weather: Clear
Direction/Lane #: WB: Westbound Direction of Travel
Edge used to measure reference distance: N/A
Edge used to measure position: N/A
Reference Distance 1: 0
Reference Distance 2: 0
Reference Distance 3: 0
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 0
Position for Stationing 2: 0
Position for Stationing 3: 0
Percent Grade for 1st Stationing: 1.0
Percent Grade for 2nd Stationing: 1.0
Percent Grade for 3rd Stationing: 1.0
Corrected Coefficients of Friction for Stationing 1: 0.50
Corrected Coefficients of Friction for Stationing 2: 0.50
Corrected Coefficients of Friction for Stationing 3: 0.50
Average Coefficient of Friction: 0.50
General comments (publicly viewable) (Max 1000 characters): Visual inspection of the test site confirms grinded surface of shoulder to be uniform for approach, bridge deck, and departure. This grided surface is in conformance and meets specs, same as the eastbound direction.

Test was verified on 9/22/2026 ✔