Summary for Test 2026-09-22-5-5
Test performed: CTM 389-19Project Information
| Project Identifiers | Project ID: 99999 DEA: 0322222 |
|---|---|
| DIST-CO-RTE-PM | 03-SAC,OMG-888,99,80-0.6-0.6 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
| Location Description | THIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES. |
| QA Service Level | (Verified on 04/05/2013) |
Sample Information
| Sample Taken Date | 09/22/2026 | Sample Unique Key | 5 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | Not set | Sample type | Informational |
| A brief description of the sample | half inch HMA sample | The quantity of what the sample constitutes | 200 |
| From where was the sample collected | Source | First name of sampler or witnessed by | John |
| Last name of sampler or witnessed by | Doe | Title of sampler | |
| Telephone number of sampler | Not set | Laboratory sample identification | 440576256 |
| Linked DIME Sample ID | Not set | The fabricator/manufacturer/facility name | Stonemont Solutions |
| Transportation Laboratory (TL) Number | Not set | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Not set | Structure name | Not set |
| Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | RHMA-G |
|---|---|---|---|
| HMA Grading | 1/2 inch | Lot number | 1 |
| Sublot number | 2 | HMA Mix Number | S25AC6231 |
| Binder content (%) | 2.4 | Virgin binder PG | PG 70-10 |
| Design binder PG | Binder Supplier | Valero | |
| RAP content (%) | 14 | WMA Additives | |
| Antistrip type |
Test Details
DIME Sample ID: 2026-09-22-5
DIME Test ID: 2026-09-22-5-5
Testing Lab: Stonemont Solutions, Incorporated
Test Method: CTM 389-19: Method of Test for Hamburg Wheel-Track Testing of Compacted Hot Mix Asphalt
Test Release Date: 2026-09-22
Test Results
Specified number of passes at 12.7 mm: 15000
Specimen Preparation Method: Field Cores
Input Type: Calculated
Tester's full name: John Doe
Date of test: 09/22/2026
Average impression at 5000 passes (left/right avg): 12.9 mm
Average impression at 10000 passes (left/right avg): 13.1 mm
Average impression at 15000 passes (left/right avg): 13.3 mm
Raw Data: no data
Average impression at 20000 passes (left/right avg): no data
Average impression at 25000 passes (left/right avg): no data
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/22/2026 ✔
