Summary for Test 2026-09-09-4-9
Test performed: CTM 202-November 2011Project Information
| Project Identifiers | Project ID: 214649 DEA: 07316004 EFIS: 0715000194 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-14-60.70 |
| Award Date | 02/07/2023 |
| Closeout Date | Not set |
| Work Description | REHABILITATION FOR THE ON/OFF RAMPS AND ADJACENT SHOULDERS. UPGRADING METAL BEAM GUARDRAILS, AC DIKES, SIGN PANELS, CURB RAMPS, TRAFFIC LOOPS DETECTORS, AND SOME OTHER HIGHWAY APPURTENANCES. |
| Location Description | ROUTE 14 FROM PALMDALE BLVD TO KERN COUNTRY LINE. |
| QA Service Level | 1 (Verified on 01/29/2020) |
Sample Information
| Sample Taken Date | 09/09/2026 | Sample Unique Key | 4 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 09/08/2026 | Sample type | Verification |
| A brief description of the sample | 3/4"HMA-A-SP R15 0.50% LAS | The quantity of what the sample constitutes | 2 Bags ea of 3/4", 1/4", 3/8", Agg; 2 Bags ea of Sand & RAP |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Christian |
| Last name of sampler or witnessed by | Gonzalez | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | 0559A-26 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Vulcan materials | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-19-0020, 91-19-0035 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Belt Cut at Plant | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2026-09-09-4
DIME Test ID: 2026-09-09-4-9
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2026-10-20
Test Results
What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: Yes
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Amir Sarder
Date of test: 09/12/2026
| Sieve Size | Cumulative Percent Passing | |||||
|---|---|---|---|---|---|---|
| 100 % | ||||||
| 100 % | ||||||
| 100 % | ||||||
| 100 % | ||||||
| 100 % | ||||||
| 100 % | ||||||
| 100 % | ||||||
| 99.6 % | ||||||
| 81 % | ||||||
| 62.9 % | ||||||
| 48 % | ||||||
| 36.1 % | ||||||
| 25.6 % | ||||||
| 16.6 % | ||||||
| 10.5 % | ||||||
General comments (publicly viewable) (Max 1000 characters): RAP Gradation After Ignition.
Test was verified on 10/20/2026 ✔