Summary for Test 2026-08-27-7-1

Test performed: CTM 342-August 2012

Project Information

Project IdentifiersProject ID: 1002184
DEA: 080N0304
EFIS: 0824000176
DIST-CO-RTE-PM08-SBD-15,40-VAR
Award DateNot set
Closeout DateNot set
Work DescriptionPolyester concrete overlay and HMA asphalt (Type A).
Location DescriptionCONSTRUCTION ON STATE HIGHWAY IN SAN BERNARDINO COUNTY AT VARIOUS LOCATIONS.
QA Service Level1 (Verified on 05/04/2026)

Sample Information

Sample Taken Date08/27/2026 Sample Unique Key7
Date that the sample was received by the laboratory/organization performing the testing08/27/2026 Sample typeAcceptance
A brief description of the sampleSkid Testing Request The quantity of what the sample constitutesTrial Slab and Multiple Lanes
From where was the sample collectedJob Site First name of sampler or witnessed byJEGBEFUME
Last name of sampler or witnessed byADODO Title of sampler
Telephone number of sampler(951) 232-6497 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameKwik-Bond
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure nameGhost Town Road UC
Bid ItemNot set

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypePolyester Concrete
Type of Traffic Control ProvidedStationary Lane Closure DIST-CO-RTE08-SBd-15
Direction of TravelNorth Post Mile81.83
Lanes to be TestedShoulder Station

Test Details

DIME Sample ID: 2026-08-27-7
DIME Test ID: 2026-08-27-7-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2026-09-18

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: Eddie Bidinger
Date of test: 09/17/2026
Air Temperature: 73 F
Tire Pressure: 25 psi
Equipment PST #: 1000-3
Is Calibration within ± values: Yes
Weather: Clear
Direction/Lane #: NB: Northbound Direction of Travel
Edge used to measure reference distance: Begin of bridge
Edge used to measure position: Left of bridge rail
Reference Distance 1: 22' ft
Reference Distance 2: 24' ft
Reference Distance 3: 26' ft
Direction and Lane # for Stationing 1: North / #2
Direction and Lane # for Stationing 2: North / #2
Direction and Lane # for Stationing 3: North / #2
Position for Stationing 1: 14 ft
Position for Stationing 2: 14 ft
Position for Stationing 3: 14 ft
Percent Grade for 1st Stationing: 0.0 %
Percent Grade for 2nd Stationing: 0.0 %
Percent Grade for 3rd Stationing: 0.0 %
Corrected Coefficients of Friction for Stationing 1: 0.46
Corrected Coefficients of Friction for Stationing 2: 0.48
Corrected Coefficients of Friction for Stationing 3: 0.48
Average Coefficient of Friction: 0.47
General comments (publicly viewable) (Max 1000 characters): Meets specs

Test was verified on 9/18/2026 ✔