Summary for Test 2026-09-14-5-1
Test performed: CTM 342-August 2012Project Information
| Project Identifiers | Project ID: 1000756 DEA: 051H6504 EFIS: 0516000118 |
|---|---|
| DIST-CO-RTE-PM | 05-MON-183-R8.3/9.9 |
| Award Date | 01/17/2025 |
| Closeout Date | Not set |
| Work Description | HMA (TYPE A), RHMA-G, DRAINAGE, LANDSCAPE, ELECTRICAL AND CURB RAMPS. |
| Location Description | MONTEREY COUNTY IN CASTROVILLE FROM 0.1 MILE SOUTH OF DEL MONTE AVENUE TO ROUTE 1/183 JUNCTION. |
| QA Service Level | 1 (Verified on 01/13/2025) |
Sample Information
| Sample Taken Date | 09/14/2026 | Sample Unique Key | 5 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 09/16/2026 | Sample type | Acceptance |
| A brief description of the sample | ROADWAY | The quantity of what the sample constitutes | PCC |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Harish |
| Last name of sampler or witnessed by | Thakur | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | JOB SITE | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Roadway/Bridge Surface | Pavement Surface Type | PCC (Portland Cement Concrete) |
|---|---|---|---|
| Type of Traffic Control Provided | Behind K-Rail/Barrier | DIST-CO-RTE | |
| Direction of Travel | Post Mile | ||
| Lanes to be Tested | Station |
Test Details
DIME Sample ID: 2026-09-14-5
DIME Test ID: 2026-09-14-5-1
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2026-09-16
Test Results
Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: HARISH THAKUR
Date of test: 09/16/2026
Air Temperature: 64
Tire Pressure: 25
Equipment PST #: 1000-7/1000-8
Is Calibration within ± values: Yes
Weather: COOL
Direction/Lane #: EB: Eastbound Direction of Travel
Edge used to measure reference distance: BEGIN BRIDGE
Edge used to measure position: LEFT OF WALL
Reference Distance 1: 3
Reference Distance 2: 6
Reference Distance 3: 9
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 7
Position for Stationing 2: 7
Position for Stationing 3: 7
Percent Grade for 1st Stationing: 0.0
Percent Grade for 2nd Stationing: 0.0
Percent Grade for 3rd Stationing: 0.0
Corrected Coefficients of Friction for Stationing 1: 0.47
Corrected Coefficients of Friction for Stationing 2: 0.47
Corrected Coefficients of Friction for Stationing 3: 0.49
Average Coefficient of Friction: 0.48
General comments (publicly viewable) (Max 1000 characters): 183/156 SEPERATION/ BR#44-0185
Test was verified on 9/16/2026 ✔