Summary for Test 2026-08-26-7-1

Test performed: CTM 342C-August 2012

Project Information

Project IdentifiersProject ID: 993551
DEA: 07279124
EFIS: 0715000076
Permit Numbers: 0722AOP1645
DIST-CO-RTE-PM07-LA-57-60-R4.3/R4.5
Award Date01/12/2023
Closeout DateNot set
Work DescriptionSTATE ROUTE 57 and 60 HIGHWAYS CONFLUENCE CHOKEPOINT RELIEF PROJECT PHASE II
Location DescriptionCITY of DIAMOND BAR and CITY of INDUSTRY LOS ANGELES COUNTY, CALIFORNIA
QA Service Level2 (Verified on 02/04/2022)

Sample Information

Sample Taken Date08/26/2026 Sample Unique Key7
Date that the sample was received by the laboratory/organization performing the testing09/09/2026 Sample typeAcceptance
A brief description of the sampleSkid Testing Request The quantity of what the sample constitutesMultiple Lanes
From where was the sample collectedJob Site First name of sampler or witnessed byChen chung
Last name of sampler or witnessed byLiu Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameRobertson mix
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberRRM 22127
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected1592903
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedBin Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2026-08-26-7
DIME Test ID: 2026-08-26-7-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 342C-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2026-09-09

Test Results


Input Type: Calculated
Tester's full name: Eddie Bidinger
Date of test: 09/09/2026
Pavement or Bridge Deck?: Pavement
Air Temperature: 99 F
Front Tire Pressure: 25 psi
Rear Tire Pressure: 25 psi
Equipment CFME #: 1000-3
Is Calibration within ± values: Yes
Weather: Clear
Direction/Lane #: EB: Eastbound Direction of Travel
Edge used to measure reference distance: Yes
Edge used to measure position: Yes
Direction and Lane # for Stationing 1: EB / ONR
Direction and Lane # for Stationing 2: EB / ONR
Direction and Lane # for Stationing 3: EB / ONR
Reference Distance 1: 30 ft
Reference Distance 2: 55 ft
Reference Distance 3: 80 ft
Position for Stationing 1: 1363 ft
Position for Stationing 2: 1363 ft
Position for Stationing 3: 1363 ft
1st set of 35 rows of data: no data
2nd set of 35 rows of data: no data
3rd set of 35 rows of data: no data
Average coefficient of friction 1st set: 0.37 coefficient of friction
Average coefficient of friction 2nd set: 0.37 coefficient of friction
Average coefficient of friction 3rd set: 0.37 coefficient of friction
Average coefficient of friction: 0.37 coefficient of friction
General comments (publicly viewable) (Max 1000 characters): Ave. .37

Test was verified on 9/9/2026 ✔