Summary for Test 2026-08-26-7-1
Test performed: CTM 342C-August 2012Project Information
| Project Identifiers | Project ID: 993551 DEA: 07279124 EFIS: 0715000076 Permit Numbers: 0722AOP1645 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-57-60-R4.3/R4.5 |
| Award Date | 01/12/2023 |
| Closeout Date | Not set |
| Work Description | STATE ROUTE 57 and 60 HIGHWAYS CONFLUENCE CHOKEPOINT RELIEF PROJECT PHASE II |
| Location Description | CITY of DIAMOND BAR and CITY of INDUSTRY LOS ANGELES COUNTY, CALIFORNIA |
| QA Service Level | 2 (Verified on 02/04/2022) |
Sample Information
| Sample Taken Date | 08/26/2026 | Sample Unique Key | 7 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 09/09/2026 | Sample type | Acceptance |
| A brief description of the sample | Skid Testing Request | The quantity of what the sample constitutes | Multiple Lanes |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Chen chung |
| Last name of sampler or witnessed by | Liu | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Robertson mix | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | RRM 22127 |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 1592903 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Bin | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2026-08-26-7
DIME Test ID: 2026-08-26-7-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 342C-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2026-09-09
Test Results
Input Type: Calculated
Tester's full name: Eddie Bidinger
Date of test: 09/09/2026
Pavement or Bridge Deck?: Pavement
Air Temperature: 99 F
Front Tire Pressure: 25 psi
Rear Tire Pressure: 25 psi
Equipment CFME #: 1000-3
Is Calibration within ± values: Yes
Weather: Clear
Direction/Lane #: EB: Eastbound Direction of Travel
Edge used to measure reference distance: Yes
Edge used to measure position: Yes
Direction and Lane # for Stationing 1: EB / ONR
Direction and Lane # for Stationing 2: EB / ONR
Direction and Lane # for Stationing 3: EB / ONR
Reference Distance 1: 30 ft
Reference Distance 2: 55 ft
Reference Distance 3: 80 ft
Position for Stationing 1: 1363 ft
Position for Stationing 2: 1363 ft
Position for Stationing 3: 1363 ft
1st set of 35 rows of data: no data
2nd set of 35 rows of data: no data
3rd set of 35 rows of data: no data
Average coefficient of friction 1st set: 0.37 coefficient of friction
Average coefficient of friction 2nd set: 0.37 coefficient of friction
Average coefficient of friction 3rd set: 0.37 coefficient of friction
Average coefficient of friction: 0.37 coefficient of friction
General comments (publicly viewable) (Max 1000 characters): Ave. .37
Test was verified on 9/9/2026 ✔